Cuestionario sobre Seguridad y Procesos 3

Cuestionario sobre Seguridad y Procesos 3

University

6 Qs

quiz-placeholder

Similar activities

Nurse-Patient Verbal/Nonverbal Communication

Nurse-Patient Verbal/Nonverbal Communication

University

10 Qs

Company Law-Recap

Company Law-Recap

University

10 Qs

Automatic Transmissions and Planetary gear sets

Automatic Transmissions and Planetary gear sets

9th Grade - University

10 Qs

Water Quality & System

Water Quality & System

6th Grade - University

10 Qs

Performance management

Performance management

University

11 Qs

MySql

MySql

University

10 Qs

WWE

WWE

KG - Professional Development

10 Qs

Nursing Fundamentals

Nursing Fundamentals

University

10 Qs

Cuestionario sobre Seguridad y Procesos 3

Cuestionario sobre Seguridad y Procesos 3

Assessment

Quiz

Specialty

University

Hard

Created by

Julio Rivera de la Hoz

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When filling a container with flammable liquid, one of the main factors that increases the generation of an electrostatic charge is:

Filling by splashing

Filling from the bottom

Overfilling

Continuous filling

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the ideal temperature for the growth of the legionella bacteria?

37°C

27°C

47°C

57°C

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Saturated steam is also known as:

Wet steam

Superheated steam

Dry steam

Supercritical water

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The transfer of heat by the movement of hot fluids is known as:

Convection

Conduction

Diffusion

Radiation

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

One of the dangers of using nitrogen as an inert gas is:

Decreased oxygen concentrations

Increased flammability

Increased flammability of oxygen

Decreased flammability

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The shutdown can be planned, unplanned, emergency, staggered, or delayed. Under which of the following circumstances would a delayed process shutdown be appropriate?

Minor valve leaks appear two weeks before a planned shutdown

The power to part of the process has suddenly failed

The cooling of a reaction vessel has been lost due to unexpectedly large water leakage

An alarm indicates that the safe operating limit of the process is about to be unexpectedly violated