1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Wilson Co. purchased land as a factory site for €600,000. Wilson paid €60,000 to tear down two buildings on the land. Salvage was sold for €5,400. Legal fees of €3,480 were paid for title investigation and making the purchase. Architect's fees were €31,200. Title insurance cost €2,400, and liability insurance during construction cost €2,600. Excavation cost €10,440. The contractor was paid €2,200,000. An assessment made by the city for pavement was €6,400. Interest costs during construction were €170,000.
The cost of the land that should be recorded by Wilson Co. is
€660,480.
€666,880.
€669,880.
€676,280.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Wilson Co. purchased land as a factory site for €600,000. Wilson paid €60,000 to tear down two buildings on the land. Salvage was sold for €5,400. Legal fees of €3,480 were paid for title investigation and making the purchase. Architect's fees were €31,200. Title insurance cost €2,400, and liability insurance during construction cost €2,600. Excavation cost €10,440. The contractor was paid €2,200,000. An assessment made by the city for pavement was €6,400. Interest costs during construction were €170,000.
The cost of the building that should be recorded by Wilson Co. is
€2,403,800.
€2,404,840.
€2,413,200.
€2,414,240.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
On February 1, 2022, Nelson Corporation purchased a parcel of land as a factory site for €200,000. An old building on the property was demolished, and construction began on a new building which was completed on November 1, 2022. Costs incurred during this period are listed below:
Demolition of old building € 20,000
Architect's fees 35,000
Legal fees for title investigation and purchase contract 5,000
Construction costs 1,090,000
(Salvaged materials resulting from demolition were sold for €10,000.)
Nelson should record the cost of the land and new building, respectively, as
€225,000 and €1,115,000.
€210,000 and €1,130,000.
€210,000 and €1,125,000.
€215,000 and €1,125,000.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Worthington Chandler Company purchased equipment for £10,000. Sales tax on the purchase was £500. Other costs incurred were freight charges of £200, repairs of £350 for damage during installation, and installation costs of £225. What is the cost of the equipment?
£10,000
£10,500
£10,925
£11,275
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Fogelberg Company purchased equipment for £12,000. Sales tax on the purchase was £600. Other costs incurred were freight charges of £240, repairs of £420 for damage during installation, and installation costs of £270. What is the cost of the equipment?
£12,000.
£12,600.
£13,110.
£13,530.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
La Bianco Company purchased land for a manufacturing facility for €1,100,000. The company paid €70,000 to tear down a building on the land. Salvage was sold for €10,500. Legal fees of €6,500 were paid for title investigation and making the purchase. Architect's fees were €40,500. Title insurance cost €4,500, and liability insurance during construction cost €13,500. Excavation cost €12,000. The contractor was paid €1,357,000. A one -time assessment made by the city for sidewalks was €7,500. La Bianca installed lighting and signage at a cost of €11,000.
The cost of the land that should be recorded by La Bianca is
€1,195,000.
€1,178,000.
€1,103,500.
€1,006,500.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
La Bianco Company purchased land for a manufacturing facility for €1,100,000. The company paid €70,000 to tear down a building on the land. Salvage was sold for €10,500. Legal fees of €6,500 were paid for title investigation and making the purchase. Architect's fees were €40,500. Title insurance cost €4,500, and liability insurance during construction cost €13,500. Excavation cost €12,000. The contractor was paid €1,357,000. A one -time assessment made by the city for sidewalks was €7,500. La Bianca installed lighting and signage at a cost of €11,000.
The cost of the building that should be recorded by La Bianca is
€1,505,500.
€1,432,000.
€1,423,000.
€1,357,500.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?