SANITATION MOCK TEST A

SANITATION MOCK TEST A

Professional Development

•

35 Qs

quiz-placeholder

Similar activities

MATERI TUN

MATERI TUN

Professional Development

•

30 Qs

PIC Revision

PIC Revision

Professional Development

•

30 Qs

1121 MANDARIN 2 TEST 2

1121 MANDARIN 2 TEST 2

KG - Professional Development

•

30 Qs

UPSR 2016 Matematik Kertas 1

UPSR 2016 Matematik Kertas 1

6th Grade - Professional Development

•

40 Qs

Autumn Panel Game

Autumn Panel Game

Professional Development

•

30 Qs

DUMIL DUMIL SESSION 3

DUMIL DUMIL SESSION 3

Professional Development

•

33 Qs

LET Practice  Exam: Prof Ed. Assessment of Learning (Part 1)

LET Practice Exam: Prof Ed. Assessment of Learning (Part 1)

Professional Development

•

35 Qs

PINOY CHALLENGE

PINOY CHALLENGE

Professional Development

•

35 Qs

SANITATION MOCK TEST A

SANITATION MOCK TEST A

Assessment

Quiz

•

Education

•

Professional Development

•

Practice Problem

•

Hard

Created by

Dipak Kerai

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

35 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which British Standard lays down the installation requirements for gravity rainwater systems?

BS 5449.

BS 6700.

BS EN 12056.

BS EN 12588.

Answer explanation

BS EN 12056 specifies the installation requirements for gravity rainwater systems, making it the correct choice among the options provided.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A below ground drainage system designed to receive both foul and surface water is said to be a

combined system

separate system

partially separate system

unvented system.

Answer explanation

A combined system is designed to handle both foul and surface water in a single drainage system, making it the correct choice for the question.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following may be used to lubricate the rubber ‘O’ ring of a ring seal joint on plastic sanitary pipework?

Flux.

Silicone spray.

Jointing compound.

Gap filling cement.

Answer explanation

Silicone spray is suitable for lubricating rubber 'O' rings as it provides a safe, effective lubrication without damaging the rubber. Other options like flux, jointing compound, and gap filling cement are not appropriate for this purpose.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum recommended depth of trap seal for a basin with pipework connecting to a discharge stack?

19 mm.

38 mm.

50 mm.

75 mm.

Answer explanation

The minimum recommended depth of trap seal for a basin connected to a discharge stack is 75 mm. This depth helps prevent sewer gases from entering the building and ensures proper drainage.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the purpose of the rainwater fitting shown in figure 1? To

make an angled connection between two rainwater pipes

discharge rainwater into a gulley

connect a length of rainwater pipe to a drain pipe

connect the gutter to the rainwater pipe.

Answer explanation

The purpose of the rainwater fitting is to discharge rainwater into a gulley, allowing for proper drainage and preventing water accumulation, which is essential for effective rainwater management.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a 12 m length of plastic gutter is laid to a fall of 1 in 600, what is the vertical drop between the gutter start and finish points?

10 mm.

20 mm.

30 mm.

50 mm.

Answer explanation

To find the vertical drop, use the formula: drop = length / fall ratio. Here, drop = 12 m / 600 = 0.02 m, which is 20 mm. Thus, the vertical drop between the gutter start and finish points is 20 mm.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A stack vent must rise to a height of 900 mm above an opening into a building when it terminates within what distance of that opening?

1000 mm.

2000 mm.

2500 mm.

3000 mm.

Answer explanation

A stack vent must rise 900 mm above an opening if it terminates within 3000 mm of that opening. This ensures proper ventilation and prevents backflow of gases, making 3000 mm the correct distance.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?