Search Header Logo

summer 23

Authored by Rob Davies

Engineering

12th Grade

summer 23
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

23 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which set best represents three stages within a risk assessment process?

Identification of hazards, Evaluation of risks, Recording findings

Brainstorming solutions, Purchasing PPE, Celebrating success

Hiring contractors, Writing job adverts, Filing invoices

Design review, Tolerance analysis, Cost estimation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

On an engineering drawing, the symbol shown as two concentric circles most appropriately indicates which control?

Flatness

Concentricity/Coaxiality

Cylindricity

Circular runout

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The symbol depicted as two parallel slanted lines on an engineering drawing communicates which requirement?

Perpendicularity

Parallelism

Surface finish

Angularity

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which trio lists wastes that are part of the ‘8 wastes’ in lean manufacturing?

Transportation, Waiting, Defects

Research, Patenting, Branding

Heating, Lighting, Leasing

HR interviews, Audits, Taxes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which option names a valid type of Continual Professional Development (CPD) and correctly links it to its benefit?

Industry placement — gain ideas from successful engineering businesses/engineers

Shadowing colleagues — reduces product shipping costs

Training courses — decrease machine depreciation

Academic study — shortens delivery lead times by default

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A manufacturer is launching a product that will be updated every few months. Which reason best justifies choosing batch production over mass production?

It guarantees zero downtime on machines

It allows small runs for each version without investing in high automation

It eliminates the need for quality checks

It ensures all customers receive identical products with no customization

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An engineering firm has limited demand and irregular material supply for a new part. Which production approach is strategically most suitable and why?

Mass production, because it reduces flexibility needs

Batch production, because it accommodates limited market volume and supply constraints

One-off production, because it requires the most automation

Continuous production, because it relies on constant material flow

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?