Search Header Logo

6035 C/W PP5

Authored by Paul Benson

Other

Professional Development

Used 3+ times

6035 C/W PP5
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

62 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must a plumber ensure about the pipework system after installation?

It is sound, flushed through, disinfected, and commissioned.

It is painted and insulated.

It is only disinfected and flushed through.

It is tested for electrical conductivity.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does "sound" mean in the context of pipework testing?

No leaks.

Proper insulation.

Chemically cleaned.

Set up correctly.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which process involves cleaning the pipework internally?

Flushed through.

Disinfected.

Commissioned.

Sound.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step in pipework testing involves chemical cleaning?

Disinfected.

Flushed through.

Sound.

Commissioned.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the testing process according to the diagram?

Visual inspection

Soundness test

Completed installation

Flushing out

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the testing process before completion?

Flushing out

Disinfecting

Hand over to customer

Soundness test

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step in the testing process involves checking the system visually for any issues?

Soundness test

Visual inspection

Flushing out

Disinfecting

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?