

Home Renovation Project Steps
Interactive Video
•
Design, Life Skills, Other
•
6th - 12th Grade
•
Practice Problem
•
Hard
Aiden Montgomery
FREE Resource
Read more
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the main goal of Johnny Brook's project in the video?
To build new shelves
To install new lighting
To paint the laundry room
To replace the vinyl floor with tile
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the first step in the room makeover project?
Painting the walls
Getting everything out of the room
Installing new lighting
Removing the old flooring
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What tool did Johnny use to remove the cord around?
Pry bar
Screwdriver
Hammer
Chisel
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why was removing the bottom layer of vinyl flooring challenging?
It was glued to the subfloor
It was covered in paint
It was attached with hundreds of narrow crown staples
It was too heavy to lift
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of the uncoupling membrane used in the project?
To make the floor softer
To uncouple the tile from the subfloor and reduce cracking
To prevent moisture
To add color to the floor
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the first step in dry fitting the tile?
Cutting the tiles to size
Marking the center point of the room
Applying thinset
Cleaning the subfloor
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What mistake did Johnny make when installing the last row of tiles?
He used the wrong type of tile
He didn't account for the thinset under the door jamb
He forgot to use spacers
He didn't cut the tiles to the right size
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?