1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was one of the main challenges faced during the site setup?
Uncooperative neighbors
Weather conditions
No side access to the back garden
Lack of materials
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why was a skip necessary at the site?
To store tools
To provide shelter
To store materials
To remove waste
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was discovered during the trench digging for the foundation?
An old well
An air raid shelter
A live sewer pipe
A hidden basement
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the purpose of the bridge installed in the trench?
To support the walls
To allow drainage pipes to be installed
To provide a walkway
To mark the boundary
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What material was used for the internal walls?
Bricks
Blocks
Concrete
Wood
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why was the steel beam carried through the house manually?
There was no other way
It was a safety requirement
It was relatively light
It was too heavy for machinery
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the main purpose of the insulation added to the roof?
To provide waterproofing
To support the structure
To retain heat
To add weight
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?