

Construction Site Operations and Discoveries
Interactive Video
•
Architecture, Design, Life Skills
•
6th - 10th Grade
•
Practice Problem
•
Hard
Liam Anderson
FREE Resource
Read more
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was discovered when digging to continue the electricity supply?
A water pipe
A telecom duct
A sewer line
A gas line
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the initial plan for the trench?
To fill it with water
To connect it to the plant room
To plant trees in it
To use it as a storage area
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why was there a need to deepen the trench?
To install a heat pipe
To find more concrete
To store more soil
To create a larger space
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was found that indicated part of the original structure?
A metal pipe
A brick wall
A wooden beam
A foundation of the garage
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How deep was the trench initially dug?
400 millimeters
800 millimeters
1000 millimeters
600 millimeters
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the reason for carefully removing glass from the site?
To recycle it
To use it in construction
To sell it
To prevent contamination of the woodland
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why was the soil not put into the dumper immediately?
The dumper was full
The dumper was not in a good place
The soil was too heavy
The dumper was broken
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?