Search Header Logo
Metal stud wall quiz

Metal stud wall quiz

Assessment

Interactive Video

Education

1st Grade

Practice Problem

Hard

Created by

forester Lindsley

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.      What is the length of the wafer head screw and what is it used for​ ​

15mm used to fix track to concrete floors

13mm used to fix track to timber floors

12mm used to fix track to tiled floors

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.      The track should be fixed to the floor using wafer head screws at what distance

400mm

550mm

600mm

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.      When fixing the C studs, they should be cut how many millimetres below the ceiling

6mm max

6.5mm max

3-5mm max

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.      When using 1200 wide plaster boards what distance should the C studs be set

600mm centres

300mm centres

500mm centres

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.      When fixing plaster boards to metal stud partition what size screw is used

15mm self-tapping screw

20mm self-tapping screw

25mm self-tapping screw

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.      What is the distance we screw fix the boards

Every 200mm

Every 300mm

Every 150mm

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?