How do engineers help people and society? Bridge project

How do engineers help people and society? Bridge project

Assessment

Interactive Video

Science, Engineering, Information Technology (IT), Architecture, Arts, Other

11th Grade - University

Hard

Created by

Quizizz Content

FREE Resource

The video follows engineering students from the University of Wisconsin Platteville as they design and construct a reinforced concrete pedestrian bridge in a Ghanaian village. The bridge aims to improve access to education, healthcare, and markets, especially during the rainy season. Despite challenges like weather and construction setbacks, the team, with significant community involvement, completes the bridge in two weeks. The project not only enhances infrastructure but also empowers the community, fostering a sense of accomplishment and future potential.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the primary reason for building the bridge in the village?

To provide a scenic view

To improve transportation and access to essential services

To create a new marketplace

To attract tourists

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of bridge did the engineering students decide to build?

A reinforced concrete pedestrian bridge

A floating bridge

A wooden bridge

A cable suspension bridge

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How did the bridge project affect the local children?

It allowed them to travel abroad

It gave them new jobs

It enabled them to attend school regularly

It provided them with new toys

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was a major challenge faced during the construction of the bridge?

Wild animals

Non-seasonable rain

Government regulations

Lack of materials

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What adjustment had to be made during the construction process?

The bridge had to be painted

The bridge had to be moved to a new location

The bridge had to be jacked up three inches

The bridge had to be shortened

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the ultimate goal of the bridge project according to the engineering students?

To win an award

To empower the community

To build a tourist attraction

To create a new city

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the anticipated long-term impact of the bridge on the community?

More traffic congestion

Increased tourism

Higher taxes

Improved education and economic opportunities