San Jose Plans Robocar Network Instead of Airport Shuttle

San Jose Plans Robocar Network Instead of Airport Shuttle

Assessment

Interactive Video

Business, Architecture, Engineering, Other

University

Hard

Created by

Quizizz Content

FREE Resource

The video discusses the concept of Personal Rapid Transit (PRT) as a more efficient alternative to traditional public transport systems like buses and subways. PRT offers on-demand, private vehicles that travel directly to the passenger's destination, reducing wait times and costs. The idea has been around for a long time but faced challenges until recent advancements in autonomous vehicle technology. The speaker highlights the next steps in development, including environmental reviews, and emphasizes the reduced environmental footprint and cost compared to traditional rail systems.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key feature of the personal rapid transit system that differentiates it from traditional public transport?

It provides individual vehicles on demand.

It operates only during peak hours.

It requires passengers to share vehicles.

It follows a fixed route with multiple stops.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What has contributed significantly to the feasibility of modern PRT systems?

Government subsidies for public transport.

Advancements in autonomous vehicle technology.

Increased demand for public transportation.

Development of high-speed rail systems.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT mentioned as a reason for the slow adoption of PRT systems?

Insufficient venture capital investment.

Complexity of integrating with existing infrastructure.

Lack of technological feasibility in the past.

High costs of implementation.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the next step in the development process of the PRT system after authorization?

Building the infrastructure.

Training personnel for operations.

Launching a marketing campaign.

Conducting environmental reviews.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does the PRT system's construction timeline compare to traditional rail systems?

It is completed in a similar timeframe.

It requires more time due to complexity.

It is much faster, taking only months.

It takes significantly longer.