Los Angeles Subway: Overcoming Challenges for a Sustainable Future

Los Angeles Subway: Overcoming Challenges for a Sustainable Future

Assessment

Interactive Video

Architecture, Arts, Engineering, Other

KG - University

Hard

Created by

Quizizz Content

FREE Resource

The video discusses the preference for cars over the subway in the city, despite the subway's complex construction on a seismic fault line. It highlights the engineering challenges, construction techniques, and economic aspects of the subway, which is unlikely to be profitable for 100 years. Future expansion plans and the subway's safety during earthquakes are also covered.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main reason people in Los Angeles prefer cars over the subway?

People prefer the comfort of their own cars.

The subway is not well connected.

The subway is too expensive.

The subway is unsafe.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was a significant challenge in constructing the LA subway?

Lack of skilled workers

Seismic fault line

Environmental regulations

High construction costs

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long is the LA subway tunnel?

15 kilometers

28 kilometers

50 kilometers

100 kilometers

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much did the LA subway tunnel cost to complete?

4.5 billion U.S. dollars

2.5 billion U.S. dollars

1 billion U.S. dollars

10 billion U.S. dollars

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What do the designers suggest locals do during an earthquake?

Evacuate the city

Go to a nearby park

Stay at home

Head for the local subway