Building a Desalination Plant from Scratch: Crash Course Engineering #44

Building a Desalination Plant from Scratch: Crash Course Engineering #44

Assessment

Interactive Video

Engineering, Business, Chemistry, Science, Other

11th Grade - University

Hard

Created by

Quizizz Content

FREE Resource

The video discusses the importance of engineering design in tackling complex challenges, particularly in the context of water scarcity and desalination. It covers the process of design synthesis, cost management, and the importance of testing at various scales before full-scale implementation. The video emphasizes the need for continuous improvement and collaboration among engineers to ensure efficient and effective solutions.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary challenge in providing clean water globally?

Lack of technology

Insufficient government policies

High cost of water

Limited access to safe water

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main technique used in desalination plants to make seawater drinkable?

Distillation

Reverse osmosis

Evaporation

Filtration

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to consider the entire process flow in industrial engineering?

To minimize environmental impact

To ensure all parts work together efficiently

To reduce labor costs

To increase production speed

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of design synthesis in engineering?

To test the final product

To calculate project costs

To integrate components and address process needs

To create a blueprint for construction

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a bench scale model used for in engineering design?

To test the process on a small scale

To finalize the construction plan

To estimate the total project cost

To train new engineers

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a major challenge when scaling up from bench scale to pilot scale?

Increased labor requirements

Nonlinear scaling issues

Higher material costs

Longer construction time

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is ongoing problem-solving important even after a plant is operational?

To address new issues and optimize performance

To reduce initial construction costs

To adapt to changing environmental regulations

To improve employee satisfaction