How do engineers help people and society? Bridge project

How do engineers help people and society? Bridge project

Assessment

Interactive Video

Science, Engineering, Information Technology (IT), Architecture, Arts, Other

11th Grade - University

Hard

Created by

Quizizz Content

FREE Resource

The video documents a project by University of Wisconsin Platteville engineering students to build a reinforced concrete pedestrian bridge in a Ghanaian village. The bridge aims to improve access to education, markets, and healthcare, especially during the rainy season. Despite challenges like weather and construction obstacles, the team, with local involvement, completes the bridge in two weeks. The project not only enhances infrastructure but also empowers the community, fostering a sense of accomplishment and potential for future projects.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the primary reason for building the bridge in the village?

To create a new marketplace

To enable children to attend school regularly

To provide a scenic view

To attract tourists

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of bridge did the engineering students decide to construct?

A wooden bridge

A floating bridge

A cable suspension bridge

A reinforced concrete pedestrian bridge

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How did the community contribute to the bridge construction?

By organizing cultural events

By designing the bridge

By participating in the construction work

By providing financial support

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was a major challenge faced during the construction of the bridge?

Language barriers

Lack of materials

Unseasonable rain

Wildlife interference

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What adjustment had to be made due to a pier settling into softer material?

The bridge was shortened

The bridge was jacked up three inches

The bridge was painted

The bridge was widened

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the final task before completing the bridge?

Painting the bridge

Planting trees around the bridge

Final concrete pour

Installing lights

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What long-term impact is expected from the bridge?

More local businesses

Higher property prices

Improved local infrastructure

Increased tourism