Python 3: Project-based Python, Algorithms, Data Structures - BST from scratch - In-order traversal

Python 3: Project-based Python, Algorithms, Data Structures - BST from scratch - In-order traversal

Assessment

Interactive Video

Information Technology (IT), Architecture, Life Skills

University

Hard

Created by

Quizizz Content

FREE Resource

The video tutorial demonstrates the execution of a job scheduler project, explaining the data file format and how jobs are loaded, added, and removed using a binary search tree. It covers job rejection due to scheduling conflicts, viewing scheduled jobs, and handling user input errors. The tutorial concludes with a summary of the program's functionality and hints at future steps.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the three pieces of information needed for each job in the scheduler?

Date, duration, and job type

Time, priority, and job type

Date, priority, and job name

Time, duration, and job name

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens if a job is scheduled at a time that conflicts with an existing job?

The existing job is rescheduled

Both jobs are scheduled simultaneously

The new job is added and the existing job is removed

The new job is rejected

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which method is used to display jobs in sorted order in the job scheduler?

Postorder traversal

Inorder traversal

Preorder traversal

Level order traversal

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is required when adding a job to ensure the time format is correct?

Time should be in hours and minutes format

Time should be in seconds format

Time should be in 12-hour format

Time should be in milliseconds format

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must match when removing a job from the schedule?

Only the job duration

The job type and priority

Only the job name

The time, duration, and job name

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens if incorrect job details are provided during the removal process?

The job is removed anyway

The job is marked for review

The removal fails and an error is shown

The job is rescheduled

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What data structure is used to manage the jobs in the scheduler?

Linked List

Binary Search Tree

Queue

Hash Table