US Engineers designing project
Interactive Video
•
Arts, Architecture, Engineering
•
11th Grade - University
•
Practice Problem
•
Hard
Wayground Content
FREE Resource
Read more
5 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary purpose of the $2,000,000 investment in the Cobbs Cook Bay project?
To create a wildlife sanctuary
To develop a series of dams
To fund a research study
To build a new city
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How is the reservoir in Cobbs Cook Bay formed?
By digging a large pit
By linking islands with bridges
By diverting a river
By connecting islands to the mainland with dams
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What happens when the tide outside falls 5 1/2 feet below the inside level?
The gates remain closed
The reservoir is drained
The powerhouse gates are opened
The water is pumped back into the sea
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the role of the auxiliary plant in the Cobbs Cook Bay project?
To desalinate water
To provide backup power during specific periods
To monitor wildlife
To store excess water
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is continuous power supply important for the Cobbs Cook Bay project?
To maintain a constant water level
To ensure the reservoir remains full
To provide power 24 hours a day
To prevent flooding
Popular Resources on Wayground
5 questions
This is not a...winter edition (Drawing game)
Quiz
•
1st - 5th Grade
15 questions
4:3 Model Multiplication of Decimals by Whole Numbers
Quiz
•
5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
10 questions
The Best Christmas Pageant Ever Chapters 1 & 2
Quiz
•
4th Grade
12 questions
Unit 4 Review Day
Quiz
•
3rd Grade
10 questions
Identify Iconic Christmas Movie Scenes
Interactive video
•
6th - 10th Grade
20 questions
Christmas Trivia
Quiz
•
6th - 8th Grade
18 questions
Kids Christmas Trivia
Quiz
•
KG - 5th Grade