What is the drilling rate of the TBM in meters per day?
First tunnel boring machine arrives for Grand Paris Express

Interactive Video
•
Science, Arts, Architecture, Engineering, Other
•
11th Grade - University
•
Hard
Quizizz Content
FREE Resource
Read more
2 questions
Show all answers
1.
OPEN ENDED QUESTION
3 mins • 1 pt
Evaluate responses using AI:
OFF
2.
OPEN ENDED QUESTION
3 mins • 1 pt
What is the length of the connecting tunnel that the TBM will drill?
Evaluate responses using AI:
OFF
Similar Resources on Quizizz
6 questions
Norway gives green light to world’s first ship tunnel

Interactive video
•
11th Grade - University
2 questions
Living Green - Episode 32 - Vattenfall Wind Farm

Interactive video
•
KG - University
6 questions
China's plan for world's most powerful particle collider explained

Interactive video
•
11th Grade - University
2 questions
CLEAN : Victorian Tunnel brought back to life for Crossrail

Interactive video
•
10th Grade - University
2 questions
China's plan for world's most powerful particle collider explained

Interactive video
•
11th Grade - University
2 questions
TED-Ed: How the world's longest underwater tunnel was built

Interactive video
•
KG - University
2 questions
Construction starts on America’s giant solar farm

Interactive video
•
11th Grade - University
2 questions
The Mirabella 5: The Ultimate Luxury Sailing Yacht

Interactive video
•
KG - University
Popular Resources on Quizizz
15 questions
Multiplication Facts

Quiz
•
4th Grade
25 questions
SS Combined Advisory Quiz

Quiz
•
6th - 8th Grade
40 questions
Week 4 Student In Class Practice Set

Quiz
•
9th - 12th Grade
40 questions
SOL: ILE DNA Tech, Gen, Evol 2025

Quiz
•
9th - 12th Grade
20 questions
NC Universities (R2H)

Quiz
•
9th - 12th Grade
15 questions
June Review Quiz

Quiz
•
Professional Development
20 questions
Congruent and Similar Triangles

Quiz
•
8th Grade
25 questions
Triangle Inequalities

Quiz
•
10th - 12th Grade