L1 Construct Brick Walling

Total questions: 20

Worksheet time: 20mins

Name
Class
Date
1.
When using a workshop drawing, the view on top of the wall is the;
a)
Block Plan
b)
Section
c)
Overview
d)
Plan view
2.
To ensure the safety of yourself & others before starting to build a model, you should have a workshop;
a)
Risk Assessment
b)
Scan
c)
Review
d)
Plan
3.
When cutting bricks on site by hand, the following PPE should be worn;
a)
Goggles, boots, hard hat, gloves, high viz
b)
Goggles, boots, gloves, high viz
c)
Goggles, hard hat, gloves, high viz
d)
Goggles, boots, hard hat, high viz
4.
When setting out brick walls, the process to ensure you have the correct bond is called;
a)
Laying out
b)
Brick bonding
c)
Dry bonding
d)
Broken bond
5.
The bond commonly used for half brick walling is called;
a)
English bond
b)
Stretcher bond
c)
Block bond
d)
Flemish bond
6.
When building a wall 3m long, the following tools are required;
a)
Trowel, level, brick hammer
b)
Trowel, level, line & pins, brick hammer
c)
Trowel, level, brick hammer, lump hammer
d)
Trowel, level, brick hammer, bolster
7.
A gauge rod is commonly used for;
a)
Measure cuts
b)
Clean cavities
c)
Maintain the height of brickwork during construction
d)
Measure the length of the wall during construction
8.
A spirit level is commonly used for;
a)
Measure the length of the wall
b)
Maintain gauge
c)
Maintain plumb
d)
Check joint thickness
9.
A brick cutting gauge is used to;
a)
Check joint thickness
b)
Maintain wall thickness
c)
Maintain the regular size of cuts
d)
Check the height of a wall during construction
10.
Continuous checks on brickwork are required to; 
a)
The bond
b)
The quality of facework
c)
The height
d)
All industrial standards
11.
When cutting face bricks, the following tools should be used;
a)
Lump hammer & bolster
b)
Brick trowel
c)
Brick hammer
d)
Scutch hammer
12.
When cutting bricks by hand, goggles should be worn;
a)
When the foreman is there
b)
If they are clean
c)
If they are available
d)
At all times
13.
The equipment used to maintain square when building a return corner is;
a)
A builders square
b)
A set square
c)
A try square
d)
An adjustable square
14.
The cut brick placed next to the quoin header when building a 1 brick wall is;
a)
Jack closer
b)
King closer
c)
Queen closer
d)
Halfbat
15.
When bonding a 1 brick return corner in English bond, when you change direction you should change the;
a)
Bond
b)
Bricks
c)
Height
d)
Joint finish
16.
The intersection between 2 walls at right angles is called a;
a)
Cavity wall
b)
Cross wall
c)
Return
d)
Tee junction
17.
When cutting expanded metal to use as ties for a block junction you should use;
a)
Pliers
b)
Tin snips
c)
Bolster
d)
Trowel
18.
When a bricklayer sets out a wall & it does not work out in exact brick sizes, they will introduce;
a)
A half bond
b)
Quarter bats
c)
A broken bond
d)
A quarter bond
19.
The most common joint finish for facing brickwork is;
a)
Flush
b)
Weather struck
c)
Filled
d)
Half round
20.
Holes left in a wall to receive bricks or blocks at a later date forming a junction are called;
a)
Hangers
b)
Wall ties
c)
Joints
d)
Indents