WorksheetsL3 Core 07
Total questions: 14
Worksheet time: 7mins
Name
Class
Date
1.
Which type of drawings are first angle and third angle projections associated with?
a)
Perspective
b)
Orthographic
c)
Isometric
d)
Axonometric
2.
What does C/C mean on a drawing
a)
Casted Carbon
b)
Cement/Concrete
c)
Centre to centre
d)
Closed centres
3.
Which is an advantage of electronic drawings against conventional drawings?
a)
Reliability
b)
Storage
c)
Cost
d)
Training
4.
Insurance contribution stage payments, travel expenses, profit, suppliers terms and conditions and wastage are some of the elements that make up:
a)
The overall estimated cost for a project for a customer
b)
The underpinning cost the contractor would have to meet
c)
The terms in which a contractor would undertake the project to complete on the customers behalf
d)
The bill of quantities for the total project for a customer
5.
If a joiner is paid £18 per hour, works 37.5 hours a week for 4 weeks and takes 1 hour per day for breaks unpaid. The joiner is then deducted 25% off their total wage for tax, national insurance and retention fee. How much will the joiner take home for that period?
a)
£1,955
b)
£1,855
c)
£1,755
d)
£1,655
6.
What is the benefit of owning equipment?
a)
Equipment availability
b)
Initial outlay
c)
Maintenance cost
d)
Depreciation Value
7.
Which of the following would not affect the profitability of a contract?
a)
Adverse weather
b)
Planned holidays
c)
Supply costs increase
d)
Unexpected delays
8.
The main reason to maintain trust and confidence with colleagues is:
a)
For a smooth collaborative working environment
b)
To reduce the risk of confrontation between tradesmen
c)
To reduce errors within the management of the project
d)
For a better working environment between the management
9.
Which of the following is not a measure that an employee can take to maintain a good working relationship?
a)
Try to understand the others point of view
b)
Practice good communication
c)
Achieve a quantity surveying qualification
d)
Attend a teamwork skills training course
10.
What information will a sectional drawing of a house give that an elevation drawing will not?
a)
It will give a detailed view of the interior construction
b)
It will show the electric and water services within the house
c)
It will give more generic measurements
d)
It will give details of the rear of the house
11.
A site TMB is set at 10 m and a 0.6 m deep foundation is required. The ground level is at 8.4 m. What is the depth of the trench from the TMB?
a)
2.8m
b)
2.2m
c)
1.2m
d)
1.8m
12.
What is the main benefit of a works programme?
a)
It gives progressive deadlines for the tasks within the contract to enable a timely completion
b)
It shows the contractors when they are required to complete their tasks
c)
It informs the site manager of the contractors progress
d)
It is a tool to enable timely delivery of materials to enable tasks to take place.
13.
Which of the following would not be included in an estimate?
a)
VAT
b)
Delivery
c)
Time
d)
Plant
14.
Poor communication between the different hierarchies within a construction environment would most likely lead to:
a)
Poor working relationships with no rise in costs
b)
The project being completed on time with a large rise in costs
c)
The project being completed on time with no rise in costs
d)
A large rise in costs and poor working relationships
100 %