NEW
Font size
S
M
L
XL
WorksheetsENGG1200 Project B
Total questions: 15
Worksheet time: 8mins
Name
Class
Date
1.
What is the name of your project leader?
a)
Lucija Hanzic
b)
Shaun Chen
c)
Angela Bushell
d)
Grant Edwards
2.
Who is the course coordinator?
a)
Jon Snow
b)
Carl Reidsema
c)
Anne Chapman
d)
Esther Fink
3.
What is the name of the project?
a)
Control System Synthesis
b)
Stormwater Treatment and Control
c)
Greywater Reuse
d)
Automated Temperature Controller
4.
What is your target mixing temperature
a)
34
b)
36
c)
38
d)
40
5.
Which one of these items is NOT part of the project?
a)
Flowmeter
b)
Arduino
c)
Mixer
d)
Temperature Sensor
6.
What is the maximum capacity of the batch tank?
a)
10 L
b)
12.5 L
c)
15 L
d)
17.5 L
7.
What type of pump is NOT available in this project?
a)
Magnetic Drive Centrifugal
b)
Diaphragm
c)
Gear
d)
Reciprocating Piston
8.
What's this for?
a)
Hose Fitting
b)
Pipe Joint
c)
Water Proofing Capsule
d)
Sensor Insertion Tool
9.
Which of these is an available temperature sensor reading
a)
Mixing Pipe Inlet
b)
Batch Tank
c)
Overflow Tank Inlet
d)
Mixing Pipe Exit
10.
Which piece of software will NOT be used in this project
a)
Solid Edge
b)
Simulink
c)
Ansys
d)
Creo
11.
What is your budget?
a)
50
b)
100
c)
150
d)
200
12.
What is the TWS?
a)
Torque Weight System
b)
Temperature and Weight Simulation
c)
Turbulent Water Simulator
d)
Tensile Weight System
13.
When is the first major piece of assessment due (memo)
a)
Week 4
b)
Week 5
c)
Week 6
d)
Week 7
14.
DN15 refers to a measurement of what?
a)
Delay Number of Control Systems
b)
Inner Diameter of Pipes
c)
Liquid Drag Ratio in Pipes
d)
Diagonal Mounting Distance of Pipes
15.
What GPA will you achieve in this course?
a)
4's open doors
b)
5, cause I'm out of fingers
c)
6, I'm not smart enough for a 7
d)
7, too ez
Reset
