1.
The "waste hierarchy" starting from the (most) preferred option is:
a)
Prevention, reuse, recycle, energy recovery, disposal.
b)
Prevention, recycle, reuse, energy recovery, disposal.
c)
Prevention, recycle, reuse, disposal, energy recovery.
2.
Which responsibility have AkzoNobel sites for waste leaving the site?
a)
To select an authorized contractor, evaluated by AkzoNobel, with the right permits for waste handling, to audit them on the right management of waste streams and to know the final destination of the waste.
b)
To select an authorized contractor, evaluated by AkzoNobel, with the right permits for waste handling.
c)
To have a HSE paragraph in the contract stating what is expected from the waste contractor.
3.
Identification of environmental impact of activities at site should include:
a)
Normal operation, abnormalities,emergency situations and accidents.
b)
Normal operation and emergency situations.
c)
Normal operation only.
4.
Countries like The Netherlands have plenty of water entering the country via the rivers, so sustainable water management is not an issue.
a)
Wrong: Each site in AkzoNobel does have to make an inventory of their water balance and assess their sustainable water management.
b)
Right: Sites in The Netherlands do not have to make an inventory of their water balance and assessments on their sustainable water management.
c)
Sites in countries like the Netherlands have to do these assessments on sustainable water management only when using ground water.
5.
The site should keep track of changes in applicable legal or other requirements related to the environment.
a)
Yes, but may be provided by specialized third parties.
b)
Yes, and done by AkzoNobel personnel
c)
No, the site will be informed by AkzoNobel or the country what to do and when.
6.
Which Directive/ Rules tackle the Environmental risks of AkzoNobel?
a)
13.02.1 / 13.02.2 and 13.02.3
b)
12.01.7
c)
12.01.9
7.
Why are Energy conservation and Sustainable water management important for AkzoNobel?
a)
Working on a long term competitive advantage in relation to our competitors and often a short or long term cost saving.
b)
Reduce costs.
c)
To make AkzoNobel more "green".
8.
How often will the site need to review the soil and groundwater condition of the site?
a)
A review must be carried out and documented at a Minimum frequency of once every 5 year.
b)
Once a year.
c)
Only one time during the due diligence period.
9.
What is the position of Akzonobel in the 2017 Dow Jones Sustainabililty Index?
a)
1
b)
2
c)
3
10.
What was the purpose for making the "Toolkit: From Waste to By-product"?
a)
Finding more sustainable waste outlets.
b)
Become number one in the Dow Jones Sustainability Index.
c)
To supply methods to prevent off-spec production.