wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

SPP & BLDG LAWS

Total questions: 35

Worksheet time: 18mins

Name
Class
Date
1.
Sale of Subdivision Lots or Condominium Buyers Protection Law
a)
PD 957
b)
PD 1216
c)
PD 1185
d)
BP 344
2.
Condominium Act
a)
R.A. 4726
b)
R.A. 4626
c)
R.A. 4776
d)
R.A. 4766
3.
Urban Development and Housing Act
a)
R.A. 7279
b)
R.A. 4726
c)
R.A. 7079
d)
R.A. 4226
4.
Stairway enclosure so designed that  products of combustion is prevented from moving in
a)
Smoke Proof Tower
b)
Ecological Unit
c)
Exhaust System
d)
Smoke Seal
5.
A law relaxes NBC, making the dwelling units more affordable without compromising health, safety and enviromental protection
a)
BP 220
b)
BP 221
c)
BP 120
d)
BP 202
6.
Graphic presentation of work to be done
a)
Drawings
b)
Concept Boards
c)
Promotional Services
d)
Presentation Cover
7.
Authorizing the variation from the original that involves changes in cost and/or time. All party must approved this.
a)
Change Order
b)
Modification
c)
Work Order
d)
Purchased Order
8.
Fire safety construction, protective and warning system
a)
Fire Code of the Philippines
b)
NFPA
c)
NFPA 101
d)
Life & Safety Code
9.
When the building is made ready for occupancy.
a)
Project Closeout
b)
Certificate of Occupancy
c)
Testing & Commissioning
d)
Project Handover
10.
Defining Open Space Act
a)
P.D. 1216
b)
P.D. 1226
c)
P.D. 1616
d)
P.D. 1260
11.
Enhancing the Mobility of Disabled Persons
a)
BP 344
b)
BP 334
c)
BP 354
d)
BP 340
12.
Over 15 meter high building structure
a)
high rise building
b)
low rise building
c)
mid rise building
d)
4 storey mixed use building
13.
Fire Code of the Philippines
a)
PD 1185
b)
RA 1185
c)
PD 11854
d)
PD 1183
14.
A result of architect’s inspection, identifies the work to be completed or corrected
a)
Punch lists
b)
De-snagging
c)
Inspection Request
d)
Issue for Compliance
15.
Air compartment or chamber to which ducts are connected
a)
Plenum
b)
Air Damper
c)
Volume Control Damper
d)
Air Louver
16.
Changes after contract execution
a)
Modifications
b)
Addendums
c)
Variation Orders
d)
Shopdrawings
17.
PDF percentage that will serve as architect's liability and supervision during Construction Phase
a)
10% of PDF
b)
10% of SPPCC
c)
5% as liability of SPPCC
d)
5% for supervision of PDF
18.
PDF percentage during Detail Design Phase
a)
20 % of PDF
b)
50 % of PDF
c)
10 % of SPPCC
d)
6 % of SPPCC
19.
PDF percentage during Schematic Design Phase
a)
15 % of PDF
b)
50 % of PDF
c)
20 % of PDF
d)
5 % of PDF
20.
PDF percentage during Contract Document Phase
a)
50 % of PDF
b)
15 % of PDF
c)
20 % of PDF
d)
5 % of PDF
21.
The Architect determines the adequate size and appropriate configuration and assemblage for a proposed project.
a)
Space Planning
b)
Architectural Planning
c)
Architectural Programming
d)
Value Management
22.
Define Acronym of AMBF
a)
Allowable Maximum Building Footprint
b)
Allowed Maximum Building Footage
c)
Allowable Minimum Building Footprint
d)
Allowable Minimum Building Footage
23.
A R1 proposed residential with a SPPCC of Php 3M. Give the PDF  percentage upon submitting of SDP (Schematic Design Phase)
a)
Php 45,000.00
b)
Php 15,000.00
c)
Php 60,000.00
d)
Php 300,000.00
24.
A R1 proposed residential with a SPPCC of Php 3M. Give the PDF percentage upon signing of contract
a)
Php 15,000.00
b)
Php 300,000.00
c)
Php 150,000.00
d)
Php 30,000.00
25.
Broad line of architectural services, that would allow the Architect to initially conceptualize an array of architectural  allied solutions
a)
Pre-Design Services
b)
Standard Professional Practice
c)
Architectural Allied Services
d)
Architectural Act of 2004
26.
Architectural research entails the conduct of primary and secondary researches and assembled facts used as basis for conclusion.
a)
Architectural Research
b)
Architectural Programming
c)
Professional Practice
d)
Performance criteria
27.
Architect states the project terms of reference including the concept, objectives & other requirements to bid architectural services
a)
Design Brief Preparation
b)
Architectural Programming
c)
Space Planning
d)
Professional Practice
28.
This method may be applied to government projects since they entail more paper work and time-consuming efforts.
a)
Lump Sum or Fixed Fee
b)
Per Diem
c)
Reimbursable Expenses
d)
Mixed Methods
29.
This method of compensation is frequently used where there is continuing relationship involving a series of Projects.
a)
Professional Fee Plus Expenses
b)
Professional Fee & Expenses
c)
Fixed Fee
d)
Honorarium
30.
This entails the formulation of site criteria, assistance to the Client in site evaluation
a)
Site Selection and Analysis
b)
Site Selection and Analyzation
c)
Site Selection
d)
Site Analysis
31.
Selection may be conducted by committees representing institutions, corporations or public agencies.
a)
Comparative Selection
b)
Direct Selection
c)
Architects Recommendations
d)
Grade A Certified
32.
It is used when undertaking a relatively small project. Based on reputation, personal or business acquaintance or recommendation.
a)
Direct Selection
b)
Comparative Selection
c)
Selection Committees
d)
Selection Process
33.
This technique is applied in the cost management process.
a)
Value Management
b)
Cost Management
c)
Budgeting
d)
Clients Financing Method
34.
Various Architects or architectural firms submit design solutions to a particular problem, judged on the basis of comparative excellence.
a)
Architectural Design Competition
b)
Pre-qualification
c)
Evaluation and Ranking
d)
Comparative Selection
35.
Define the Acronym of DOLE
a)
Department of Labor & Employment
b)
Department of Labor & Exchange
c)
Department of Labor & Employer
d)
Division of Legal Environment