Hot water revision level 2

Total questions: 31

Worksheet time: 16mins

Name
Class
Date
1.

The recommended minimum diameter for gravity circulation pipework, between the boiler and hot water storage cylinder in a direct hot water system, is

a)

22mm

b)

15mm

c)

28mm

d)

35mm

2.

The minimum capacity recommended by British Standard 6700 for a cold water storage cistern, that is feeding all outlets in a dwelling (both hot and cold) is

a)

380 litres

b)

450 litres

c)

400 litres

d)

200 litres

3.

What type of service valve is usually fitted to the cold feed pipe to a hot water storage cylinder?

a)

Spherical plug valve.

b)

Full way gate valve.

c)

Non-return valve

d)

Supply stop valve

4.

Which one of the following plastic pipe materials is usually used for domestic hot and cold supply and distribution water pipework?

a)

Acrylonitrile Butadiene Styrene (ABS).

b)

Polypropylene copolymer (PP)

c)

Polybutylene

d)

Unplasticised polyvinyl chloride (PVC – U).

5.

Which one of the following should be positioned in either the bottom of the hot water storage cylinder, or in the cold feed pipe to the storage cylinder?

a)
b)
c)
d)
6.

Hydraulic test procedures for rigid pipework systems routinely requires a standing period to

a)

Allow the water in the system to get into any dead ends of pipework

.

b)

Allow all air within the system to reach the highest point within the system

c)

Permit the indicator needle on the test equipment pressure gauge to settle down

d)

Allow all water and pipework to reach the ambient temperature

7.

Which one of the following requires that domestic hot water systems have insulated components?

a)

British Standard 5440.

b)

Building Regulations.

c)

Construction Regulations.

d)

Control of Substances Hazardous to Health Regulations

8.

Unprotected copper pipe is most likely to corrode

a)

In an airing or cylinder cupboard

b)

In a fireback arrangement to a solid fuel boiler

c)

Under insulation in a roof space where air cannot circulate

d)

When jointed to plastics

9.

A temperature sensing cartridge can be found in

a)

a shower mixer valve

b)

An electric immersion heater for a hot water storage cylinder

c)

A screened warning pipe assembly for a storage and feed cistern

d)

A pressure reducing valve

10.

Check valve assemblies can be an integral part of a

a)

horizontal electric immersion heater

b)

Thermostatic shower valve

c)

Cylinder thermostat

d)

Fullway gate valve.

11.

When installing taps in accommodation for the elderly or infirm, which of the following is preferable?

a)

Standard pillar tap.

b)

Quarter turn pillar tap.

c)

Fullway service valve

d)

Screwdown bib tap.

12.

Which one of the following items of work would usually be recorded on a maintenance record

a)

Settings on thermostatic mixer valves in a shower block

b)

Cleaning spray heads on a domestic shower in a bathroom

c)

Disinfection of a cold water system in a dwelling

d)

Installing a new shower system

13.

The spray from a shower head, fed from a shower mixer valve set to provide both hot and cold water, has reduced to 'dribble'. The cause of this problem may be

a)

shower head spray holes are blocked by scale

b)

Hot water feed is blocked at the cylinder connection

c)

Cold water storage cistern is overflowing

d)

Cold water feed is blocked at the storage cistern

14.

When hot water is drawn from a washbasin some distance away from the hot water cylinder, a creaking noise comes from below the timber floor where the hot water distribution pipes pass. The possible cause of this noise could be

a)

movement of the floorboards

b)

A loose tap washer on the wash basin tap which spins as the water passes through

c)

Thermal expansion of the hot water pipes which are a tight fit in notched timber floor joists.

d)

Vibration of the tap at the wash basin

15.

Before commencing work on the replacement of an electric immersion heater, the most important action is to

a)

Drain a quantity of water from the hot water cylinder applying temporary bonding

b)

Turn off the electrical supply at the consumer unit, lock the MCB and check for safe isolation

c)

turn off the electrical supply at the immersion heater switch in the kitchen

d)

Isolate the electrical supply to the property by turning off the main switch

16.

Which one of the following provides the legal requirements for the installation of hot water distribution pipework?

a)

Water Regulations.

b)

Construction Regulations.

c)

Building Regulations

d)

British Standard 6700

17.

In order to isolate the hot supply from the hot water storage vessel to the taps, a service valve should be located on the

a)

primary return

b)

Primary flow

c)

Open vent

d)

Cold feed

18.

A plumber suspects an electrical fault on a supply to an immersion heater. The first action the plumber should take is to

a)

Touch it to see if its live

b)

Call an electrician

c)

Safely isolate the circuit

19.

The main reason for installing a secondary circulation supply, to hot water draw off taps is to

a)

To make more money from the job

b)

Prevent the possibility of dead legs

c)

To reduce the amount of pipework

d)

Prevent the possibility of dead arms

20.

The purpose of a double check valve on a mains fed shower is to

a)

Prevent backflow.

b)

Prevent front flow

c)

Prevent side flow

d)

Prevent up flow

21.

The Water Fittings and Materials Directory is published by the

a)

BBC

b)

ITV

c)

HSE

d)

WRAS

22.

The most probable cause of excessively high water temperatures at the tap outlets on a system heated by an immersion heater is

a)

the thermostat being set too low

b)

The fuse rating being too high

c)

Incorrect cable sizing.

d)

Total thermostat failure

23.

Guidance on the requirements for access to hot water pipework is covered by

a)

BS6700

b)

Highway code

c)

Radio times

d)

BS9999

24.

What is the name of this hot water system

a)

Primary circulation.

b)

Secondary circulation

c)

Thirdly circulation

d)

Reversed circulation

25.

To prevent the possibility of future noise problems when installing hot water copper pipework in floor joists, a plumber should

a)

Make allowance for expansion and contraction of the pipework

b)

Screw through the pipes to stop them moving

c)

Lay noise reducing materials under carpets

d)

Lay the pipework to falls to avoid air-locks and pipe vibration

26.

A customer complains that the water from the hot tap is not hot enough. The most likely cause of the problem is

a)

Incorrectly set time clock

b)

Incorrectly set cylinder thermostat

c)

Incorrectly set frost thermostat

d)

Incorrectly set gate valve or drain off valve

27.

Details of the positions of pipes and components for a hot water system installation can be found

a)

Asking the plumbers merchants

b)

By asking the customer

c)

In the Bill of Quantities

d)

On the installation Plan

28.

Which one of the following domestic systems is outside the scope of BS 6700?

a)

Hot water.

b)

Sanitation.

c)

Cold water

d)

Unvented hot water

29.

A shower booster pump with twin impellor is

a)

Sited before the shower mixer boosting both hot and cold supplies

b)

Sited between the shower mixer valve and the shower head

c)

Connected to the cold supply only

d)

Connected to the hot supply only

30.

Pillar taps to a washbasin are to be replaced with a mixer tap that mixes water in the body of the tap. The hot tap is supplied from storage and the cold tap from the supply pipe. The type of valve that must be fitted to the hot and cold basin pipework is a

a)

Single check valve

b)

Double check valves

c)

Triple check valve

d)

Drain off valve

31.

What should happen to the hotwater pipework as it leaves the cylinder

a)

It should be painted to prevent corrosion

b)

It should be insulated to prevent heat loss

c)

It should be labelled

d)

It should be adequately clipped