wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Production Planning & Control | Resources Planning

Total questions: 10

Worksheet time: 10mins

Name
Class
Date
1.

Resource planning is...

a)

a medium-range plans which involves scheduling technique that help managers in arranging medium-range activities

b)

a short-range plans which involves scheduling technique that help managers in arranging short-range activities

c)

a long-range plans which involves scheduling technique that help managers in arranging long-range activities

d)

all of the above

2.

Among the listed items below, which one is not the input required to develop the MRP?

a)

Bill of material

b)

Lead time

c)

Routing file

d)

Inventory data

3.

The list of components, ingredients, and materials required to produce a product is the...

a)

engineering change notice

b)

bill of material

c)

purchase order

d)

material requirements plan

4.

Lead time...

a)

is the time required to acquire an item; purchase, produce, or assemble

b)

consists of move, setup, assembly, run times for manufactured items

c)

presents time-phased product structure

d)

is all of the above

5.

The difference between gross material requirements and net material requirements is...

a)

there is inventory on hand for net material requirements

b)

there is inventory on hand for gross material requirements

c)

there is no inventory on hand for net material requirements

d)

none of the above

6.

Enterprise Resources Planning (ERP) is software that allows companies to..

a)

share a common database and business practices throughout the enterprise

b)

produce information in real time

c)

automate and integrate business processes

d)

all of the above

7.

From the list below, which one is not the advantage of ERP?

a)

Creates commonality of database

b)

Implementation may require major changes in the company and its processes

c)

Increases communication and collaboration among business units and sites

d)

Provides integration of the supply chain, production and administrative process

8.

What are the concepts that contribute to lean production system?

a)

Eliminate waste

b)

Remove variability

c)

Improve throughput

d)

All of the above

9.

Which one of the following is not considered as waste?

a)

Motion

b)

Standard

c)

Inventory

d)

Queues

10.

Throughput is...

a)

producing more or producing early

b)

any deviation from the optimum process that delivers perfect product on time, every time

c)

is a measure (in units or time) that it takes to move an order from receipt to delivery

d)

movement of people or equipment