Total questions: 72
Worksheet time: 43mins
What are the inputs of the initiation phase? Two correct answers
Feasibility report
Constraints list
User requirements
User constraints
What are the outputs of the evaluation phase? Two correct answers
User documentation
Final review port
Feasibility study
Constraints list
What are the outputs of the initiation phase? Three correct answers
Feasibility report
Phase review
The gestation implications
Test results
What are the inputs into the planning stage? Two answers
Feasibility report
Legislation implications
Phase review
Test results
What are the outputs of the planning stage ? Three correct answers
Project plan
Test plan
Feasibility report
Constraints list
What is input into the execution phase? Three correct answers
Project plan
Test plan
Constraints list
User documentation
What are the outputs of the execution phase? Three correct answers
Test results
Phase review
Deliverable product
User documentation
What are the inputs into the evaluation phase? Two correct answers
Deliverable product
Final review report
Test results
User documentation
What does workflow mean one answer?
Assets such as images and videos to be included in the final report
It is a given point in time when it a task is expected to be started or finished
Which tasks are dependent on another, which tasks have to be completed before moving onto the next which task can be completed at the same time as others
It's time in a project plan with no tasks assigned to it
What does milestone mean?
It is a time where images and videos are included
A milestone is a given point in time where task is expected to be started or completed
It is time where task have to be completed before another
It means backing up your work so you have more time in reserve
What does the word contingency time mean?
It's where you save all your work in case of problems
It means where you plan to finish early
It means where you add in the odd week when you feel like it to have a week off
Time in a project plan with no tasks assigned this is used if tasks are not completed on time to make sure the end project still meets the final deadline.
What is the word given to items such as images videos to be included in the final project?
Milestones
Assets
Products
Deliverables
What is it called when you can't complete task to until task one has been fully finished.
Contingency
Milestone
Dependent task
Workflow task
What are components a and B called in a Pert chart?
Nodes or milestones
Random Letters
Direction of flow
What is the purpose of the directional arrow from A to B
Direction of flow
Direction of flow and dependent task that must be completed in order
Specific measurable attainable realistic time orders
Alphanumeric's
In the acronym smart what does the letter a stand for?
Achievable
Attainable
Advisable
In the acronym smart what does the letter T stand for?
Time
Time flow
Time direction
Time to date
In the acronym smart what does the R stand for?
Reasonable
Realistic
Reachable
Relevant
In the acronym smart what does the S stand for?
Specific
Specified
Sponsor
Superlative
Specification
What types of data is ABC 123
Alphanumeric
Text
Date
Boolean yes no
What data type is the following "Mr Hall"?
Alphanumeric
Text
Date
Boolean
Real
What is the following data type "30 04 2018" ?
Deliverable date
Data
Date
Feedback date
What is the following in the example of male/female
Text
Data
Date
Boolean
A hospital is going to be collecting data about its patients it is then going to be included in its new IT equipment design which of the following answers is best to describe what is required to be done when setting out on this data collection and development?
The product will be delivered to the correct specification by following the project life-cycle within agreed timescales all members of the project team will understand their roles and responsibilities the objectives will be clearly measurable will be a way of checking the data is accurate e.g. with validation to check patients age is within a sensible parameter in their postcode or data birth are in the correct format.
The product will be delivered to the correct specification by following project life cycle this means having a range of people delivering all their own sections, to within the specification with. Asking nice questions so patients feel valued, spending time getting to know the patient out was history.
The product will be delivered to the correct specification by following the project life-cycle, this means not sticking to any timescale letting people the creative and design their own elements, ensuring all questions are open, ensuring the data is different which will mean plotting dated difficult.
Which is the best answer for the advantage and disadvantage of using a tablet to collect data in a hotel reception?
Advantage information go straight into central storage, people answer the questions as opposed to sending an email out later, return rate will be high on answered questions, disadvantage battery life may be short so might need to keep plugging it in people may feel pressured and answer the questions inaccurately.
Advantages people fill in the answers how they feel or not because they feel under pressure, people could not care when they check out so will just click anything, data will often not correlate so difficult to use, disadvantage battery life lasts a long time on a tablet so will last the whole day there will need securing so no one steals it
What is the name of the new acts responsible for making data safe?
General data protection regulation GDPR
Data protection act
Data protection act 1988
What are two security measures needed to be put in place to keep data secure?
Process lawfully fairly and transparent manner in relation to individuals.
Ensure that all data is saved in the UK and outside the EU so it is backed up in safe
Data should be accurate relevant and limited to what is necessary relations the purposes for which they are processed
Data permits identification of data subjects for long periods of time
If an attack on the website of malicious requests flooded from all of the world what type of attack is this?
Denial of service DDos
Denial of data
Denial of decisiveness
Denial of successions
Which of the following is the best password so a hacker could not access it from outside. Or inside an organisation?
Password 123
!29WaS598! 32
RoYgBiV
Oattw3rsotw52
!QA"WS£ED$RF%TG^YH&UJ*IK(OL)P:
Which of the following our formal planning tools?
Gantt hurts mind map
Gantt chart or pert chart visualisation diagram
Gantt chart flowchart mind map
Gantt charts pert chart task list
The charity wants to present the total raised from a fundraiser over a year what are the most appropriate types of graft to present this information
Line graph
Bar graph
Scatter graph
Pie chart
What is the advantage of using a sensor to collect data? Two correct answers
It works 24 seven
It is expensive
It is reliable
Data can be controlled and put where you would like it in the format required
If you had to deliver information at a local church that does not have any Internet access what would be the best presentation method using a computer with standard office packages.?
Presentation software with graphs embedded into it
Presentation software and online information
A flashing all dancing PowerPoint and video image
What type of storage device has a solid disc spinning unit and a rotating arm?
Solid-state drive
Optical device
Hard disk using magnetic discs
Flash memory
What is the best type of drive for a computer's operating system?
Hard disk magnetic drive
Optical disk drive
Solid-state drive
Flash memory
What is the memory called the using a camera or small stick that you carry around with you. Doc?
Disk drive memory
Optical memory
Flash memory
SDHCX
S stands for
Smart
Small
Special
Syndicated
M stands for
Measurable
Mean
Minimal
Mobile
A stands for
Achievable
Answerable
Actual
Average
R Stands For
Realistic
Relative
Reactive
Rotational
T stands for
Time Efficient
Totalitarian
True
Tenuous
Which is a smart objective?
I will revise LO1.2 of my ICT tonight for half an hour
I will win the lottery
I will be an astronaut
I will save £100000 in my lifetime
Students scoring at a Level 0-2 on the pre-assessment will improve by 2 levels on the pre-assessment.
Students scoring at a level 3-4 on the pre-assessment will improve by 1 level on the post-assessment.
Students scoring at a level 5 on the pre-assessment will advance their skills through an independent project.
How SMART is the objective?
Select the TRUE statement.
How SMART is the objective?
Select the TRUE statement.
Students scoring below grade level will improve their scores by 1.5 grade levels.
Students scoring at or above grade level will improve their scores by 1.0 grade levels. How SMART is the objective?
Select the TRUE statement.
Select the FALSE statement.