UPC Chapter 6 quiz

Total questions: 44

Worksheet time: 22mins

Name
Class
Date
1.

The code requirement for an adequate supply of potable running water is for ___________________.

a)

safety and sanitation

b)

protection of trap seals

c)

water-cooled equipment

d)

hydronic systems

2.

In occupancies where plumbing fixtures are installed for ________, hot water shall be required for bathing and washing purposes.

a)

public use

b)

commercial use

c)

private use

d)

daycare facilities

3.

Except as required in Sections 1610.0 and 1617.0, non-potable water systems shall have a _____________ with black uppercase lettering, with the words "CAUTION: NON-POTABLE WATER, DO NOT DRINK."

a)

white background

b)

blue background

c)

green background

d)

yellow background

4.

The primary reason for installing backflow prevention assemblies is to ________________________.

a)

prevent excessive pressure

b)

prevent mixing of hot and cold water

c)

prevent pollution or contamination of the potable water supply

d)

prevent scalding

5.

All backflow devices or assemblies shall be tested by a __________________________.

a)

licensed agent

b)

representative from the Authority Having Jurisdiction

c)

certified backflow tester

d)

third-party certified agency

6.

Choose the answer you think is correct for the minimum height of the atmospheric vacuum breaker above the point specified.

Above all downstream piping for lawn sprinkler system atmospheric vacuum breakers: _________

a)

1"

b)

6"

c)

12"

d)

24"

7.

Backflow prevention devices installed in the water supply line to steam boilers shall be installed ________________________.

a)

6 inches above the floor

b)

6 inches above the boiler

c)

12 inches above the floor

d)

12 inches above the boiler

8.

Ballcocks in water closet tanks shall be installed so that the critical level of the water inlet is above the full opening of the overflow pipe at least ________________________.

a)

1/2 inch

b)

1 inch

c)

3 inches

d)

6 inches

9.

Choose the answer you think is correct for the minimum height of the atmospheric vacuum breaker above the point specified.

Above the overflow rim of a vat: __________

a)

1"

b)

2"

c)

6"

d)

12"

10.

The piping material not approved in the code for water piping located inside a building is ___________.

a)

PVC

b)

PE

c)

asbestos cement

d)

All of the above

11.

CPVC water pipe may be used for hot and cold water distribution systems _________________.

a)

in residences only

b)

within a building

c)

below ground only

d)

above ground only

12.

Copper water tube Type “M” may be installed within a building _____________________.

a)

below slab only

b)

above ground only

c)

for cold water only

d)

if it is wrapped

13.

The color stripe on Type “K” hard-drawn copper tubing is ______________.

a)

green

b)

blue

c)

red

d)

yellow

14.

Cast-iron fittings, up to and including two inches in size, when used in connection with potable water piping, shall be ________________________.

a)

extra heavy

b)

flanged

c)

disallowed

d)

galvanized

15.

All malleable iron water fittings shall be ________________________.

a)

2 inch or smaller

b)

galvanized

c)

flanged

d)

removed

16.

PEX tubing shall not be installed within the first ____ of piping connected to a water heater.

a)

12 inches

b)

18 inches

c)

24 inches

d)

36 inches

17.

Flexible corrugated connectors of copper or stainless steel for water heater connectors shall be limited to _______________.

a)

12 inches

b)

18 inches

c)

24 inches

d)

36 inches

18.

When brazing, the alloys shall have a melting temperature of at least ___ degrees F.

a)

800

b)

840

c)

1000

d)

1200

19.

Flaring tools are used to make joints for________________________.

a)

hard Type K copper tubing

b)

soft copper water tubing

c)

yellow brass water piping

d)

aluminum water piping

20.

A push fit fitting is _____________________.

a)

assembled using excessive force.

b)

assembled by pushing tube / pipe into a fitting and is sealed by an o-ring.

c)

prohibited by code.

d)

permitted to be installed in accessible locations only.

21.

Surfaces to be joined by soldering or brazing shall be cleaned bright by _____________________.

a)

mechanical or manual means

b)

a self-cleaning flux

c)

a corrosive flux

d)

sulfuric acid

22.

Solder and fluxes used in piping systems conveying potable water are prohibited when the lead content exceeds_____________________.

a)

0.2 of 1 percent

b)

0.5 of 1 percent

c)

1 percent

d)

less than 10 percent

23.

The minimum wall thickness for threaded plastic pipe shalI be _____________________.

a)

Schedule 40

b)

ScheduIe 80

c)

1/8 inch

d)

1/16 inch

24.

Heat fusion weld joints _________________________

a)

are used in some thermoplastic systems.

b)

are low temperature, metallic weld joints.

c)

require prior approval of an AHJ.

d)

may be used in drainage systems but not pressure systems.

25.

Water valves 2-1/2 inches and larger may have bodies that are ________________________.

a)

galvanized

b)

die-cast

c)

aluminum core

d)

cast iron

26.

The type of valve required on a building supply to any building is a ________________________.

a)

fullway valve

b)

corporation valve

c)

butterfly valve

d)

globe valve

27.

Immediately ahead of each water-supplied appliance and each slip joint or nonmetallic water supply connection is required a ________________________.

a)

control valve

b)

check valve

c)

backwater valve

d)

solenoid valve

28.

After allowing for friction and other pressure losses, the residual water pressure shall be at least _______.

a)

.433 psi

b)

7.5 psi

c)

15 psi

d)

29 psi

29.

A water piping system with a pressure of 110 psi will require a(an) ________________________.

a)

reduced pressure backflow device

b)

extra-heavy pipe and fittings

c)

pressure regulator and strainer

d)

pressure-relief valve

30.

Combination temperature and pressure relief valves shall be installed ________________________.

a)

based on their listing requirements and the manufacturer’s instructions

b)

within 3 inches to 6 inches of the water heater

c)

in lieu of pressure-relief valves

d)

on all non-storage-type water heaters

31.

Any water system that prevents dissipation of building pressure back into the water main shall be

provided with an approved, listed, and adequately sized ________ or other approved device.

a)

double-check valve

b)

expansion tank

c)

temperature & pressure relief valve

d)

PRV

32.

Each pressure-relief valve installed inside of the building shall have a ________________________.

a)

full size drain extended to outside

b)

check valve to prevent backflow

c)

trapped drain line

d)

drain that terminates 30 inches or more above grade

33.

Discharge from a relief valve into a water heater pan shall be ______________.

a)

permissible under any conditions

b)

Permissible if the pan has a 1” drain to an approved location

c)

prohibited

d)

prohibited if seismically strapped

34.

Changes in direction of copper tubing may be made with _______________________.

a)

bending equipment

b)

heat annealing

c)

metallic fittings

d)

plastic fittings

35.

Water piping may be installed in the same trench with sewer piping made of ________________.

a)

cast iron

b)

clay

c)

asbestos cement

d)

bituminized fiber

36.

Galvanized steel piping installed under a concrete floor slab within a building shall________________.

a)

have a machine-applied coating

b)

have a spiral wrap

c)

be installed without joints

d)

be installed with brazed joints

37.

Copper tubing used for water piping under a concrete slab within a building shall be _______________.

a)

installed with brazed joints with cast brass fittings

b)

protected with a factory-applied coating

c)

installed without joints where possible

d)

installed with Type K copper tube with brazed joints

38.

The duration for a water system pressure test shall be for a period of not less than ____ minutes?

a)

5

b)

10

c)

15

d)

30

39.

Except for plastic piping, water piping systems may be tested with ________________________.

a)

10 psi air pressure

b)

50 psi air pressure

c)

10 psi CO2

d)

60 psi CO2

40.

The distance between a water heater and the union on the water lines shall not be more than ________________________.

a)

6 inches

b)

12 inches

c)

18 inches

d)

24 inches

41.

The quantity of water required to be supplied to every plumbing fixture shall be represented by ________________________.

a)

gallons per minute

b)

feet per second

c)

fixture units

d)

available head pressure

42.

Building supplies shall be no smaller than that required for the installation and, in no case, smaller than ________________________.

a)

1/2 inch

b)

3/4 inch

c)

1 inch

d)

2 inches

43.

Other than systems sized by the use of Table 6-6, the maximum velocity of a cold water system containing copper and copper alloy tube and fittings shall be limited to ________________________.

a)

5 feet per second

b)

8 feet per second

c)

10 feet per second

d)

15 feet per second

44.

The size and material of irrigation water piping installed outside of any building and separated from the potable water supply by means of an approved backflow prevention device is __________________.

a)

regulated by code

b)

not regulated by code

c)

regulated by the National Sanitation Foundation

d)

regulated by the American Society of Sanitary Engineers