wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Interior Design. Chapter 6

Total questions: 58

Worksheet time: 3hrs 14mins

Name
Class
Date
1.

an evaluation of a commercial company's organizational structure that impact the design of the series of space

a)

desk audit

b)

adjacency matrix

c)

block and stack diagram

d)

client program

2.

The process of submitting a sealed envelope detailing the price and terms of an offer. The recipient of the offer then selects the competitive bidder that has delivered the lowest price or best terms (Basically an Auction).

a)

criteria matrix

b)

specifications

c)

competitive bid process

d)

punch list

3.

An abstract idea, thought, notion, or image that involves an imagery-evoking statement that describes the desired mood or feeling or the client’s interior space.

a)

schematics

b)

design process

c)

client program

d)

design concept

4.

Visiting the site of a project to gather information.

a)

site visit

b)

material board

c)

punch list

d)

building codes

5.

the process of evaluation buildings in a systematic and rigorous manner after they have been built and occupied for some time

a)

punch list

b)

building codes

c)

POE, post-occupancy evaluation

d)

specifications

6.

Shows the vertical functions such as elevators and stairways

a)

elevations

b)

block and stack diagram

c)

bubble diagram

d)

building permit

7.

authorization to construct the building in a specific location - for the client’s project.

a)

shop drawings

b)

field measurements

c)

building permit

d)

zones

8.

A document that outlines the client project-functions, specific need requirements in each space, issues, and current status.

a)

construction documents

b)

design documents

c)

schematic design

d)

client program

9.

a scale drawing that serves as a guide for the construction

a)

working drawing

b)

general bubble diagram

c)

furniture plan

d)

elevations

10.

organizational technique that groups together areas

a)

specifications

b)

building codes

c)

perspective drawing

d)

zones

11.

a method that interior designers use for organizing their work, guiding their actions, and finalizing their decisions.

a)

construction documents

b)

field measurements

c)

perspective drawings

d)

design process

12.

an in-depth fact-finding analysis of the client problem and estimates of product and construction costs to solve the problem

a)

feasibility study

b)

schematic design

c)

post occupancy evaluation

d)

bubble diagram

13.

is an idea produced in three dimensions--an original prototype of your product and idea

a)

perspective drawings

b)

model

c)

design documents

d)

field measurements

14.

An elevation drawing that shows a series of multiple walls from different rooms along a consecutive plan; a vertical slice cut through a series of elevations along the entire length or width of a building.

a)

block and stack diagram

b)

scale

c)

adjacency matrix

d)

section

15.

Quick drawing the designer uses to help the client envision floor plans, circulation patterns, three-dimensional spaces, and more.

a)

construction documents

b)

furniture plan

c)

material board

d)

schematic drawings

16.

Vertical representations of walls in the space

a)

section

b)

shop drawing

c)

elevation

d)

block and stack diagram

17.

The designer adds furniture and equipment to the floor plan to determine whether each room or area needs more or less. This diagram is called a furniture plan. Scale for commercial projects is typically ⅛” = 1’-0”.

a)

furniture plan

b)

general bubble diagram

c)

design concept

d)

criteria matrix

18.

A type of concept map that uses ovals and circles to represent rooms and their relationships within the diagram of the building footprint

a)

design documents

b)

building codes

c)

punch list

d)

general bubble diagram

19.

regulations adopted by a community to govern the construction of buildings; ensures structural integrity and safe evacuation the event of a fire

a)

punch list

b)

specifications

c)

building codes

d)

shop drawings

20.

List of tasks the builder or subcontractor completes - during and after construction - before the final building inspection and client occupation of a space.

a)

punch list

b)

working drawings

c)

feasibility study

d)

scale

21.

Used to communicate to the client proposed color palettes for the designed spaces. A sample board prepared by the designer that contains swatches of interior materials as well as photographs of interior

a)

feasability study

b)

desk audit

c)

material board

d)

perspective drawings

22.

A ratio of proportion or relative size

a)

scale

b)

specification

c)

elevation

d)

section

23.

A detailed description of the design and materials used to make something.

a)

specificaiton

b)

construction administration

c)

building codes

d)

zones

24.

During this phase, designers identify the problem and understand the scope and sequence.

a)

Phase 1: Pre-Design

b)

Phase 2: Programming

c)

Phase 3: Schematic Design (SD)

d)

Phase 5: Contract/Construction Documents (CD)

25.

During this phase, designers identify design problems, conduct research, create matrix, and anticipate future needs.

a)

Phase 7: Post-Occupancy Evaluation

b)

Phase 2: Programming

c)

Phase 6: Contract/Construction Administration (CA)

d)

Phase 5: Contract/Construction Documents (CD)

26.

This phase begins the concept development. Designers create bubble diagrams, space planning and budget projections, and drawings to reflect client needs.

a)

Phase 1: Pre-Design

b)

Phase 2: Programming

c)

Phase 3: Schematic Design (SD)

d)

Phase 5: Contract/Construction Documents (CD)

27.

During this phase, the design is refined, floor plans, furniture plans and architectural details are developed.

a)

Phase 1: Pre-Design

b)

Phase 2: Programming

c)

Phase 4: Design Development (DD)

d)

Phase 5: Contract/Construction Documents (CD)

28.

This phase include: Specification Books, Bidding and Negotiations, Selecting contractors, amongst other things.

a)

Phase 5: Contract/Construction Documents (CD)

b)

Phase 7: Move-in and Post-Occupancy Evaluation

c)

Phase 3: Schematic Design (SD)

d)

Phase 4: Design Development (DD)

29.

The main task of this phase is completing the working drawings to be used for construction purposes.

a)

Phase 6: Construction/Contract Administration (CA)

b)

Phase 7: Move-in and Post-Occupancy Evaluation

c)

Phase 4: Design Development (DD)

d)

Phase 5: Contract/Construction Documents (CD)

30.

This phase happens after the design in complete, and construction has started.

a)

Phase 6: Construction/Contract Administration (CA)

b)

Phase 7: Move-in and Post-Occupancy Evaluation

c)

Phase 3: Schematic Design (SD)

d)

Phase 4: Design Development (DD)

e)

Phase 5: Contract/Construction Documents (CD)

31.

During this phase, a punch list must be completed.

a)

Phase 6: Construction/Contract Administration (CA)

b)

Phase 5: Contract/Construction Documents (CD)

c)

Phase 3: Schematic Design (SD)

d)

Phase 4: Design Development (DD)

32.

At this phase, Interior Designers oversee the moving-in and arrangement of FF&E.

a)

Phase 6: Construction/Contract Administration (CA)

b)

Phase 7: Move-in and Post-Occupancy Evaluation

c)

Phase 3: Schematic Design (SD)

d)

Phase 5: Contract/Construction Documents (CD)

33.

It is during this phase that a project can be considered and evaluated for LEED Certification.

a)

Phase 6: Construction/Contract Administration (CA)

b)

Phase 7: Move-in and Post-Occupancy Evaluation

c)

Phase 3: Schematic Design (SD)

d)

Phase 5: Contract/Construction Documents (CD)

34.

Scheduling and budget considerations start as early as what phase?

a)

Phase 1: Pre-Design

b)

Phase 5: Contract/Construction Documents (CD)

c)

Phase 3: Schematic Design (SD)

d)

Phase 4: Design Development (DD)

35.

The _____ phase includes site research, as well as client approval of other spatial needs assessments the designer has gathered.

a)

Phase 1: Pre-Design

b)

Phase 2: Programming

c)

Phase 3: Schematic Design (SD)

d)

Phase 5: Contract/Construction Documents (CD)

36.

Which phase is the earliest in which FF&E (fixtures, furniture and equipment) as well as color schemes are suggested?

a)

Phase 6: Construction/Contract Administration (CA)

b)

Phase 7: Move-in and Post-Occupancy Evaluation

c)

Phase 3: Schematic Design (SD)

d)

Phase 4: Design Development (DD)

e)

Phase 5: Contract/Construction Documents (CD)

37.

During this phase, the designer is refining FF&E, Interior Arch. details, and the budget.

a)

Phase 6: Construction/Contract Administration (CA)

b)

Phase 7: Move-in and Post-Occupancy Evaluation

c)

Phase 4: Design Development (DD)

d)

Phase 5: Contract/Construction Documents (CD)

38.

Which Element of Design is utilized the LEAST?

a)

Line

b)

Space

c)

Color

d)

Movement

39.

Which Principle of Design is the most evident here?

a)

Symmetrical Balance

b)

Scale and Proportion

c)

Contrast

d)

Movement

40.
This design fills the human need for _____. 
a)
nature
b)
privacy
41.
This design fills the human need for _____. 
a)
nature
b)
privacy
42.

What Element of Design is most prevalent here?

a)

Value

b)

Form

c)

Line

d)

Light

43.
What Elements and Principles of Design are most prevalent here?
a)
color, line, movement
b)
value, space, scale
c)
contrast, proportion, light
d)
form, rhythm, focal point
44.

This interior strongly utilizes _____.

a)

symmetrical balance

b)

variety and contrast

c)

texture and focal point

d)

color

45.

What elements or principles of design are most prevalent here?

a)

line, shape and pattern

b)

value, light and space

c)

movement, color

d)

emphasis, light

46.

What elements or principles of design are most prevalent here?

a)

space, light

b)

color, movement

c)

texture, rhythm

d)

color, emphasis

47.

What elements or principles of design are most prevalent here?

a)

scale and proportion

b)

form and light

c)

pattern and line

d)

space and proportion

48.

The nature wall creates a _____ and shows _____.

a)

line, proportion

b)

pattern, space

c)

focal point, texture

d)

value, light

49.

The lighting feature creates a sense of _____.

a)

movement and rhythm

b)

color and focal point

c)

scale and proportion

d)

shape and balance

50.

What elements of design is MOST prevalent here?

a)

shape

b)

light

c)

line

d)

space

51.

What element of design is MOST prevalent here?

a)

form (3d)

b)

shape (2d)

c)

texture

d)

space

52.

What element of design is MOST prevalent here?

a)

texture

b)

color

c)

light

d)

space

53.

What principle of design is MOST prevalent here?

a)

proportion

b)

radial balance

c)

symmetrical balance

d)

movement

54.

The wood wall uses ___ to create ___.

a)

lines, movement

b)

color, form

c)

light, space

d)

texture, scale

55.

What principle of design is MOST prevalent here?

a)

pattern

b)

movement

c)

proportion

d)

scale

56.

What principles of design are MOST prevalent here?

a)

symmetrical balance and focal point

b)

color and texture

c)

space and proportion

d)

form and movement

57.

What principles of design are MOST prevalent here?

a)

symmetrical balance and color

b)

line and light

c)

shape and scale

d)

form and movement

58.

What principle of design is MOST prevalent here?

a)

pattern

b)

movement

c)

radial balance

d)

scale