SDLC

Total questions: 40

Worksheet time: 19mins

Name
Class
Date
1.
SDLC stands for...
a)
System development life cycle. 
b)
Software development litigation cycle. 
c)
System development life conditions. 
d)
Software development life cycle. 
2.

During SDLC, a prototype is developed..

a)

During the Design phase.

b)

During the Planning phase.

c)

During the Implementation phase.

d)

During the Analysis phase.

3.
Which of these are performed in the Analysis phase?
a)
Approve all project requests.  
b)
Build a prototype. 
c)
Perform a detailed analysis of the old system. 
d)
Review and allocate resources to the project. 
4.

Which of these is the correct order of the SDLC?

a)

Maintenance, Planning, Design, Analysis, Implementation

b)

Analysis, Planning, Design, Maintenance, Implementation

c)

Planning, Analysis, Design, Implementation, Maintenance

d)

Planning, Analysis, Implementation, Design, Maintenance

5.

A detailed analysis covers all of these EXCEPT

a)

The user's needs and requirements.

b)

Acquire hardware and software.

c)

Study how the current system works.

d)

A recommendation of a solution.

6.

When should users be trained on a new system?

a)

During the Analysis phase.

b)

During the Implementation phase.

c)

During the Design phase.

d)

During the Planning phase.

7.

In which phase is the performance of the new system monitored?

a)

During the Analysis phase.

b)

During the Maintenance phase.

c)

During the Design phase.

d)

During the Implementation phase.

8.
An acceptance test is carried out.. 
a)
When testing the new system with other integrated systems. 
b)
When testing the new system module by module. 
c)
When testing that the new system works on the hardware. 
d)
When testing that the new system works with real data and real users. 
9.
Which of these are performed in the Analysis phase?
a)
Approve all project requests.  
b)
Build a prototype. 
c)
Perform a detailed analysis of the old system. 
d)
Review and allocate resources to the project. 
10.

Which stage comes after Design?

a)

Planning

b)

Analysis

c)

Implementation

d)

Maintenance

11.

What happens in the Implementation Stage?

a)

Plan the proposed system

b)

Create the new system and test it

c)

Decide how well the new system is working

12.

"I asked questions verbally to all the employees of the accounts department at Greensteds School, to find out how their systems work."

Identify which phase would above process take place?

a)

Planning

b)

Analysis

c)

Design

d)

Implementation

13.

How many types of testing performed during Implementation Phase?

a)

1

b)

2

c)

3

d)

4

14.

Abandoning the old and starting up the new is describing ________ conversion.

a)

Pilot

b)

Phased

c)

Direct

d)

Parallel.

15.

What stage of the system life cycle follows the Analysis stage?

a)

Implementation

b)

Analysis

c)

Planning

d)

Design

16.

What phase does the programmer meet with the client to talk about the requirements for the software?

a)

Design

b)

Analysis

c)

Implementation

d)

Maintenance

17.
In which phase of the software development life cycle would the programmer install the software on the user's system?
a)
Testing
b)
Documentation and maintenance
c)
Deployment
d)
Implementation and integration
18.

In which phase do you create the system?

a)

Design

b)

Implementation

c)

Maintenance

d)

Planning

19.

What stage of the system life cycle is where the system is set up and installed?

a)

Analysis

b)

Design

c)

Maintenance

d)

Implementation

20.
in Analysis Phase, the main purpose of the Preliminary Investigation (feasibility study) is .....
a)
to determine the exact nature of the problem or improvement and decide whether it is worth pursuing
b)
to determine the users’ wants, needs, and requirements;
c)
to develop all of the details of the new or modified information system
21.

(1) Review and Approve the project requests;

(2) Prioritize the project requests;

(3) Allocate resources such as money, people, and equipment to approved projects;

(4) Form a project development teamfor each approved project.

These activities are found in

a)

Planning Phase

b)

Analysis Phase

c)

Implementation Phase

d)

Maintenance Phase

22.
Conducting preliminary investigation is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
23.
Acquire hardware and software is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
24.
Developing details of system is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
25.
Install and test new system is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
26.
Prioritizing project request is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
27.
Developing programs is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
28.
Converting to new system is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
29.
Monitoring system performance is done in which phase?
a)
Planning
b)
Analysis
c)
Maintenance
d)
Implementation
30.
Train users is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
31.
Performing maintenance activities is done in which phase?
a)
Planning
b)
Maintenance
c)
Design
d)
Implementation
32.
Reviewing project request is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
33.
Assessing system security is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Maintenance
34.
Allocating resources is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
35.
Review Documents, Observe, Survey, Interview and research are some of the tools used in this  activity. This activity is ....
a)
Detailed Analysis
b)
Preliminary Investigation
c)
Acquire hardware and software
d)
Install and Test the New System
36.
Choose the suitable reason for initiating a System Development Project
A. To correct an error in existing system.
B. Instruction from government  eg: GST in resit.
C. Improve Hardware and Software.
D. Impress the Company Directors
a)
A, B and C
b)
A, B and D
c)
A, C and D
d)
All of the above
37.
In this phase, a steering committee is involve in reviewing, prioritizing, allocating resource and appointing project team.
Choose the person who is not considered as a part of the steering committee.
a)
Civil Engineer
b)
Non management User
c)
Managers
d)
System Analyst
38.
There are 4 activities involve in the Design Phase. Choose one of the correct activity in the option below
a)
 Acquire hardware and software
b)
 Develop programs
c)
Assess system security
d)
Determine the users’ wants, needs, and requirements
39.
Perform Detail Analysis is one of the major activities found in the Analysis Phase.
The 3 activities found in detail analysis are
1.  ________________________
2.  Determine the users’ wants, needs, and requirements
3. Recommend a solution
a)
Determine the exact nature of the problem or improvement and decide whether it is worth pursuing
b)
Conduct a preliminary investigation
c)
Study how the current system works
d)
 Develop all of the details of the new or modified information system
40.
Logical Design can be found in the Analysis phase. What about Physical Design
a)
Design Phase
b)
Planning Phase
c)
Implementation Phase
d)
Operation, Support, and Security Phase