Challenge Quiz - Payment Management

Total questions: 10

Worksheet time: 10mins

Name
Class
Date
1.

What does SOP Act stands for?

a)

Standard Operating Procedure Act

b)

Security of Payment Act

c)

Secure Online Payment Act

d)

Standards of Performance Act

2.

Which of the following contract is COVERED under SOP Act?

a)

Supply and delivery of office stationery and equipment

b)

Construction of residential property (Building Plan not required)

c)

Design consultancy for construction project in Singapore

d)

Employment contract

3.

What types of contractual clauses are not allowed by the SOP Act?

(MORE THAN ONE ANSWER)

a)

Pay-when-paid provisions

b)

Payment terms

c)

"Contract out" provisions

d)

All of the above

4.

Can sub-contractor use the SOP Act to claim against the main contractor for unpaid completed works?

a)

Yes

b)

No

5.

Which of the following is NOT the reason for the implementation of SOP Act in Singapore?

a)

Improve cash-flow and facilitate payment

b)

Provide a fast and low-cost avenue to resolve design issues

c)

Provide a fast and low-cost avenue to settle payment disputes

d)

To void 'pay-when-paid' provisions

6.

Which of the following is/are requirement(s) as set out in the Act for a payment claim to be considered valid?

(MORE THAN ONE ANSWER)

a)

Identify the contract

b)

Claimed amount

c)

Indicate the period in which the valuation of work done is made

d)

Made in writing

7.

If the payment response amount is less than contractor's claimed amount, reasons for the differences must be stated in the payment response.

a)

True

b)

False

8.

The contractor served a payment claim for the month of September. However, QS assessed that there is no work done on site. Is there a need to provide a payment response?

a)

Yes

b)

No

9.

Which of the following is NOT a valid reason for withholding payment in a payment response?

a)

Unauthorised work done by contractor

b)

Arithmetical error in computation

c)

Stating "Same reason stated in the previous payment response"

d)

Failure to submit supporting documents i.e. joint measurement forms

10.

Which of the following is NOT a scenario which leads to a right to adjudicate?

a)

Contractor did not receive a payment response despite payment claim served.

b)

Contractor has not completed the rectification works during the Defects Liability Period.

c)

Payment response is issued by the Employer but the contractor has not been paid by payment due date.

d)

Contractor disagrees with the payment amount assessed.