4. Testing V Model

Total questions: 11

Worksheet time: 4mins

Name
Class
Date
1.

This process is to check the development results against the original requirements.

a)

Verification

b)

Validation

c)

Software Testing

d)

Software Quality Assurance

2.

Which option best describes objectives for test levels with a life cycle model?

a)

Objectives should be generic for any test level.

b)

Objectives are the same for each test level.

c)

The objectives of a test level don't need to be defined in advance.

d)

Each level has objectives specific to that level.

3.

Beta testing is:

a)

Performed by customers at their own site.

b)

Performed by customers at the software developer's site.

c)

Performed by an independent test team.

d)

Useful to test software developed for a specific customer or user.

4.

Which of the following is usually the test basis for integration testing?

a)

Program specification

b)

Functional specification

c)

Technical specification

d)

Requirement specification

5.

A top-down development strategy affects which level of testing most?

a)

Component testing

b)

Integration testing

c)

System testing

d)

User acceptance testing

6.

In V-Model testing, what is the main purpose of verification activities?

a)

To check if the software works in the real-world environment

b)

To ensure the product meets user expectations

c)

To confirm that each development phase produces the correct outputs

d)

To evaluate usability through user feedback

7.

Which of the following statements are true?

(i) For every development activity there is a corresponding testing activity.

(ii) Each test level has the same test objectives.

(iii) The analysis and design of tests for a given test level should begin after the corresponding development activity.

(iv) Testers should be involved in reviewing documents as soon as drafts are available in the development life cycle.

a)

(i) and (ii)

b)

(iii) and (iv)

c)

(ii) and (iii)

d)

(i) and (iv)

8.

This person's role includes defining, recording, and continually reviewing the testing project metrics, monitoring test progress against the test schedule, and writing test summary reports.

a)

Tester

b)

Tester Leader

9.

Scenario: A bug was previously reported where the "Live Shuttle Bus Tracker" feature did not display the correct location of campus buses. After the bug fix is implemented, re-testing is conducted specifically on this feature to confirm that the issue has been resolved and the tracker now functions accurately under various conditions.

a)

Re-testing

b)

Regression Testing

10.

After a new feature is added to display a newly constructed building on campus, the development team conducts a series of tests on existing app functionalities such as "Search Location", "Route Planner", and "Accessibility Filter" to ensure they still work as intended and were not disrupted by the recent update.

a)

Re-testing

b)

Regression Testing

11.

In the context of the Software Development Life Cycle (SDLC), what is the primary goal of "Shift-Left" testing?

a)

To move all manual testing efforts to the final deployment phase to ensure the UI is perfect.

b)

To outsource the testing phase to a third-party vendor located in an earlier time zone.

c)

To integrate testing activities earlier in the development process, such as during requirements and design, to identify defects as soon as possible.