IS development(chapter3)

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

At which level are project management practices established?

a)

Level 1

b)

Level 2

c)

Level 3

d)

Level 4

e)

Level 5

2.

Which of the following is not part of process management activities?

a)

Improving

b)

Defining

c)

Monitoring

d)

Coordination

3.

Strategy in which feasibility and risks are continuously re-evaluated throughout a project:

a)

Risk management

b)

Strategic information systems plan

c)

Creeping commitment

d)

Processes management

4.

The factoring of the lifetime of an information system into two stages, (1) systems development and (2) systems and maintenance

a)

System development

b)

System life cycle

c)

System development process

d)

System development methodology

5.

Translation of business user requirements into a system model that depicts technical implementation of the user's requirements

a)

Logical design

b)

System model

c)

Physical design

d)

Process design

6.

Pictorial representation that depicts what a system does:

a)

Physical model

b)

Data model

c)

Process model

d)

System model

7.

Which of the following is not part of the category the problems represented by the PIECES framework?

a)

Efficiency

b)

Economics

c)

Technology

d)

Control

8.

Any factor, limitation, or restraint that may limit a solution or the problem solving process

a)

Constraint

b)

Scope creep

c)

Risk

d)

System requirement

9.

Which of the following is not part of the requirements analysis phase

a)

Data

b)

Priorities

c)

Performance level

d)

Analysis paralysis

10.

A comparison of business and technical requirements for a commercial application package against capabilities and features of a specific commercial application package to define requirements that cannot be met :

a)

Feasibility analysis

b)

Technical feasibility

c)

Decision analysis

d)

Gap analysis