wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Solid walling, Piers and Mortar

Total questions: 17

Worksheet time: 8mins

Name
Class
Date
1.

What voltage is recommended for a mixer?

a)

240v

b)

180v

c)

415v

d)

110v

2.

What type of Brick is this?

a)

Traditional

b)

Engineering

c)

Wire cut

d)

Hand made

3.

What does a plasticiser do?

a)

Trap regulated bubbles in the mortar to produce a workable mix

b)

Adds random bubbles into the mix so its frothy

c)

Adds plastic into the mix

d)

Makes the mix smell nice

4.

After building an isolated pier how could you protected it from getting damaged?

a)

Inform colleagues where it is and to be careful

b)

Erect a suitable barrier around it

c)

put a sign on it

d)

put a pallet on top of it

5.

what type of coping is this called?

a)

Horseback

b)

sloping

c)

Saddleback

d)

Double

6.

What is the best way to strengthen a hollow pier?

a)

Use a strong 3-1 mix

b)

Fill with concrete and steel re-enforcement

c)

Fill with rubble

d)

Fill with soil

7.

What type of bond is this?

a)

English

b)

French

c)

Stretcher

d)

English Garden wall

8.

What type of Joint is this?

a)

Flush

b)

Half round

c)

Recessed

d)

Weather struck

9.

What type of joint is this?

a)

Weather cut and struck

b)

Flush

c)

Half round

d)

Recessed

10.

Soldier courses, dog tooth and dentil courses are type of what?

a)

Line courses

b)

Special courses

c)

String courses

d)

extra course

11.

How big is a Queen Closer?

a)

100mm

b)

46mm

c)

50mm

d)

200mm

12.

What is the name of this Bond?

a)

Welsh Bond

b)

English Bond

c)

Flemish Bond

d)

French Bond

13.

What is the gauge for 10 courses of brick?

a)

650mm

b)

700mm

c)

825mm

d)

750mm

14.

What angle are bricks layed at when Dog toothing

a)

90

b)

55

c)

45

d)

60

15.

Gate hangers should be

a)

Screwed on after construction

b)

Bolted on after construction

c)

Bedded in as construction progresses

d)

Bed them when you remember

16.

Where should cuts in a broken bond be placed?

a)

On a return

b)

Wherever you want

c)

Under a reveal

d)

In the quoin

17.

Whats the minimum bond required for Brickwork?

a)

Half Bond

b)

Quarter Bond

c)

Three quarter bond

d)

Whatever look good