wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Plumbing L2 Hot water

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

What valve should be installed on the outlet of a cold water cistern

a)
b)
c)
d)
2.

What is this tool used for?

a)

Installing an Immersion heater

b)

Cutting holes in plastic cisterns

c)

Fitting taps

d)

Fitting float valves

3.

The regulations that cover Hot water systems are?

a)

The Water Regulations 1999 and Building regulation part H

b)

The Water Regulations 1999 and Building regulation part G

c)

The Water Regulations 1999 and Building regulation part P

d)

The Water Regulations 1999 and Building regulation part B

4.

This picture shows?

a)

A direct cylinder

b)

An Indirect cylinder

c)

A combination Cylinder

d)

A prismatic cylinder

5.

The purpose of this valve is to?

a)

Control the water flow to the cylinder

b)

Prevent hot and cold water mixing in the pipe work

c)

Mix hot and cold water to prevent scalding

d)

Prevent the water in the cylinder from reaching above 65 dc

6.

What is the max temperature of water on a bath in a new build home?

a)

43

b)

60

c)

48

d)

38

7.

An electric shower is a form of?

a)

Direct single point hot water

b)

Indirect single point hot water

c)

Indirect multi point hot water

d)

Direct multi point hot water

8.

This picture shows?

a)

A unvented cylinder

b)

A thermal store

c)

A Direct cylinder

d)

A Indirect cylinder

9.

A hot water cylinder connected to the main water supply is know as a?

a)

Unvented cylinder

b)

Indirect cylinder

c)

Direct cylinder

d)

Boiler

10.

What British standard covers Hot water installation?

a)

BS6700

b)

BS1212 part 2

c)

BSEN806

d)

BSEN6700

11.

The minimum size of storage cistern for a system supplying cold and hot water is?

a)

115 litres

b)

230 litres

c)

80 litres

d)

180 litres

12.

The minimum size of vent pipe is?

a)

15mm

b)

28mm

c)

22mm

d)

The same size as the cold feed pipe

13.

Too prevent one pipe circulation the vent pipe must step across by how many mm.

a)

150mm

b)

300mm

c)

450mm

d)

600mm

14.

What must be fitted to all new immersion heater thermostats?

a)

A thermal cut out

b)

A warning light

c)

A thermostat set to 50

d)

A 13amp plug

15.

What are the disadvantages of a direct cylinder?

a)

Risk of rusty water

Risk of scale build up

Lack of temperature control

b)

Expensive to install

Two cisterns in loft area

c)

Lack of pressure

Lack of CW storage

Pumped showers cannot be fitted

d)

Cheap to install

Suited for flats/chalets

Easy to install

Compliant with part L

16.

This picture shows a?

a)

Immersion heater

b)

Surry flange

c)

Essex flange

d)

Cylinder thermostat

17.

Building regulation part L states that all pipe work within what distance of the cylinder needs to be lagged?

a)

2m

b)

1.5m

c)

1m

d)

450mm

18.

The thermostats on a hot water cylinder should be set at?

a)

48 to 55 degrees C

b)

43 to 70 degrees C

c)

48 to 60 degrees C

d)

60 to 65 degrees C

19.

What should be fitted to all cold water cisterns?

a)

A float operated valve to BS1212 part 1

b)

A float operated valve to BS1212 part 2

c)

A overflow warning light

d)

A float operated valve to BSEN806 part 2

20.

Building regulation part L states that a cylinder must heat in how many minutes?

a)

30

b)

25

c)

60

d)

35