Lean Green Belt dag 2

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

The two levels of Kaizen are:

a)

System and Process Kaizen

b)

System and Machine Kaizen

c)

Process and Machine Kaizen

d)

Process and People Kaizen

2.

A team launching a kaizen workshop will NOT

a)

Learn continuous flow principles

b)

Go to the gemba and assess the actual situation

c)

Define and implement improvements

d)

Immediately extend the improvements throughout the plant

3.

Which of these is the best way to measure the waste of defects?

a)

Scrap rate

b)

First Time Through (FTT)

c)

Overall Equipment Effectiveness (OEE)

d)

Units per employee

4.

Which of the following is a quality tool used to assess correlation of data?

a)

Control chart

b)

Check sheet

c)

Scatter diagram

d)

Pareto

5.

What is not an element of the Define phase?

a)

determine scope

b)

determine performance

c)

determine main point for improvement

d)

develop project charter

6.

What is not a Lean measure?

a)

Customer satisfaction

b)

Schedule attainment

c)

Cost per unit

d)

Inventory turns

7.

The performance of 2 departments is investigated and expressed by Sigma values. Department A has a Sigma value of 4 and department B a Sigma value of 2. What does this mean?

a)

Department A is two times more reliable than department B

b)

Department B is two times more reliable than department A

c)

Department B has less variation than department A

d)

Department A has less variation than department B

8.

Six Sigma methodologies emphasize mathematical and statistical tools to improve the quality of processes that are already under control. Its quality reference standard is

a)

Achieving 3.4 defects per one thousand opportunities

b)

Achieving 3.4 defects per one hundred opportunities

c)

Achieving 3.4 defects per one million opportunities

d)

Achieving 3.4 defects per one hundred million opportunities

9.

Why is it important to do measures in Lean?

a)

A Pareto analysis gives insight in the vital fev

b)

It gives a better indication of the size of a problem

c)

It gives more certainty about the effect of an improvement

d)

All of these answers

10.

The best approach to avoid resistance to change in a Lean project is:

a)

Give extensive instructions on what should be done

b)

Allow the persons involved to participate in decisions on how the expected change can be realized

c)

Give exhaustively information on the number of working hours that can be saved

d)

Threaten that external forces will take over if the change doesn’t take place

11.

What is a better motivator to keep an employee satisfied, rather than asking him/her to do something “extra”?

a)

Better working times

b)

Influence on decisions

c)

Variety in tasks

d)

More challenging tasks

12.

A plant manager is explaining to his foremen the advantage of appointing a change agent. This means that

a)

We need to have a state-of-the-art equipment

b)

We need to find a person willing to lead the change

c)

We need to find a new, breakthrough technology

d)

None of the above

13.

A project charter should be as detailed as possible

a)

Yes, every detail of the project must be described

b)

Yes, in case a new project leader takes over het project

c)

No, just the themes the project leader thinks that are relevant

d)

No, it should be brief, with all the predefined topics

14.

What is not a part of a Project Charter?

a)

Description of the goals

b)

Extended risk analyses

c)

Planning

d)

Description of the scope

15.

How long does a Kaizen event take?

a)

5 days

b)

A month

c)

A year

d)

There is no time limit, because continuous improvement never ends