Font size
WorksheetsEmergency Preparedness
Total questions: 35
Worksheet time: 17mins
It is potentially damaging event that may cause injury or loss of life, damage to property etc.
A. Capacity
B. Vulnerability
C. Hazard
D. Risk
The DFID funded Boston Consulting Group study report on return on investment for emergency preparedness by UNICEF and WFP found that;
64% of the preparedness investments saved both time and costs
The initial investment of $5.6 million saved a total of $12 million toward future humanitarian response
Preparedness investments can speed response time by two to 50 days or an average of more than one week
All the above
In the Emergency Preparedness Platform which of the following are process MPS?
MPS 3, 4 & 5
MPS 1, 2 & 3
MPS 5, 6 & 8
MPS 7, 9 & 10
It is the combination of all the strengths, attributes and resources available within a community, society that can be used to achieve agreed goals
A. Capacity
B. Vulnerability
C. Hazard
D. Risk
In the EPP which MPS deals with the administration and funding management
MPS 3
MPS 9
MPS 1
None of the above
At the country level who is responsible for approving the final EPP
Chief of section
Representative
Chief of Emergency
Chief of Operation
It is a characteristics and circumstances of a community, system or asset that make it susceptible to the damaging effects of hazard
A. Capacity
B. Geological Factor
C. Risk
D. Vulnerability
It is expressed as the number of human lives and value of the properties that can potentially be affected by hazards.
A. Capacity
B. Risk
C. Exposure
D. Disaster
Environmental phenomenon that occurs when warm ocean surface water temperature results in severe drought.
La Niña
El Niño
Typhoon
Landslide
What does the abbreviation HAC stands for in UNICEF
Humanitarian Action for Children
Humanitarian Appeal for Children
Humanitarian Alliance for Children
Humanitarian Assistance for Children
What does EPF stands for in UNICEF?
Emergency Pooled Fund
Emergency Planning and Formulation
Emergency Programme Fund
None of the above
What does AAP stands for within Humanitarian setting?
All Alliance for People in crisis
Alliance for All people in Crisis
Accountability to Affected Population
Action for Affected Population
What does EPP stands for within UNICEF?
Emergency Preparedness Plan
Emergency Preparedness Procedure
Emergency Preparedness Platform
Emergency Plan for Preparedness
The inter-agency humanitarian appeal In a Level 2 or Level 3 emergency is called?
Humanitarian Consolidated Appeal
Humanitarian Needs Overview
CERF
Humanitarian Response Plan
What type of funding is available to UNICEF country office at the onset of emergency (within 24 hours)
CERF
EPF
National Committees
Reprogramming RR and ORE
Which sector is not included in the Sphere Handbook programme technical areas?
Health
WASH
Education
Child Protection
Which of the four is not one of the humanitarian principles?
Neutrality
Humanity
Independence
Impartiality
None of the above
Inter agency and multi cluster assessment conducted after an emergency is called
Initial Rapid Assessment
MIRA
Preliminary Assessment
All of the above
Using the Result Based Management approach the result chain flow includes;
Activities/Inputs/Indicators/Outcomes/Impact
Impact/Outcomes/Outputs/Activities/Inputs
Inputs/Activities/Outcomes/Outputs/Impact
Input/Output/Activities/Outcome/Impact
The Small Scale Funding Agreement (SSFA) validity period is
12 months for $50,000 grant
3 months for supplies
6 months for supplies and cash
B & C
A & B
When a service to be provided can be obtained from the local market based on the best value for money the recommended modality of engagement is?
PCA
SSFA
Institutional Contract
Simplified PCA
Which of the four is NOT a criteria for determining Level 2 or L3 emergency
Funding needs
Complexity
Scale
Reputational Risk
In the EPP which step covers Humanitarian Performance Monitoring indicators?
Step 2
Step 1
Step 4
Step 3
One of the key outcome from the Humanitarian Summit is
Sphere Handbook 2018
Sendai Framework
Grand Bargain
Paris Agreement
During emergency which sector or cluster is NOT led by UNICEF
Protection
WASH
Education
Nutrition
The four steps for annual preparedness planning within UNICEF include;
Risk Analysis and Monitoring
Scenario Definition
Elements of Emergency Response
Developing Preparedness Actions
Developing Coordination Mechanisms
The 2015 Sendai Framework for disaster risk reduction identified four key priorities for action. Select the four priorities
Understand disaster risks
Enhance Disaster Preparedness for effective response and build back better
Strengthen disaster risk governance
Comprehensive school safety
Investing in disaster risk reduction and resilience
Which is of the following is not the main objective of CERF?
Promote early action and response to reduce loss of life
Enhance response to time critical requirements
strengthen core elements of humanitarian response
Promote beneficiary livelihoods
Which minimum preparedness standard in the EPP addresses the humanitarian cash transfers
MPS 5
MPS 9
MPS 7
MPS 10
In 2019 Nepal HCT Monsoon Flood preparedness Plan how many people are estimated to be at risk of being affected
1.3 million
1 million
500,000
750,000
2 million
Which of the following are UNICEF strategies to strengthen the linkages between Humanitarian and Development
Strengthening systems and localizing Humanitarian and Development programming
Risk Informed Programming
Strengthening Social Protection Systems
Galvanizing partnerships to mobilize quality resources
All the above
In Sri Lanka who leads the Child Protection Sector or Working Group
RC Office
Government
Save the Children
UNDP
In the EPP Planning process what is the threshold for contingency planning
20
16
25
15
In the EPP platform which MPS 7 addresses;
Logistics and supply
cluster coordination
staff and surge capacity
Partnerships
Which MPS deals with alignment of the EPP with BCP and Enterprise Risk Management
MPS 3
MPS 5
MPS 8
MPS 10
