wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Drywall Acoustical Ceilings

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

Carriers are the secondary load-bearing component that makes up the suspension system.

a)

True

b)

False

2.

Sometimes cold-rolled channels (CRC) can be used as carriers.

a)

False

b)

True

3.

What amount of clearance should be left between the desired ceiling height and any object above?

a)

1"

b)

3"

c)

6"

d)

12"

4.

Laser levels should be checked periodically for which of the following?

a)

vibrations

b)

security

c)

calibration

d)

mounting

5.

Perimeter and seismic wires are additional wires used in seismic applications.

a)

True

b)

False

6.

For walls with dimensions from the outside of the finish wall to the outside of the finish wall,

add the thickness of the drywall to locate the rough wall or track line.

a)

True

b)

False

7.

When measuring from an inside corner to an outside corner or from an outside corner to an inside corner, the

finish wall and the rough dimensions stay the same.

a)

False

b)

True

8.

Avoid using any pushing force when cutting through metal with aviation snips. Add no

pressure to the true cut. The hand could slide into the metal edge, resulting in serious injury.

a)

True

b)

False

9.

Learning about the dangers of a jobsite and avoiding them is your responsibility. This

is the first rule in safety.

a)

True

b)

False

10.

The tendency to grow tired is always present in any kind of work that is repetitious.

a)

False

b)

True