1.

What is the key concern when multiple Scrum Teams are working on the same Product Backlog?

a)

Minimizing dependencies between teams

b)

Clear definition of requirements

c)

Maximizing velocity

d)

Making sure everyone has enough work

2.

How should Product Backlog items be chosen when multiple Scrum Teams are working from the same Product Backlog?

a)

The Scrum Master assigns to Scrum Teams

b)

The Product Owner assigns to Scrum Teams

c)

Each Scrum Team takes equal number of items

d)

Each Scrum Team pulls in as per discussion with Product Owner

3.

Which statements best describe Definition of Done?

a)

It creates transparency over the work inspected at the Sprint Review

b)

It provides an entry criteria for Sprint work

c)

It controls whether Developers have performed their tasks

d)

It guides the Developers in forecasting during Sprint Planning

4.

When many people are working on same DoD, what best describes the Definition of Done?

a)

Each Scrum Team has their own DoD

b)

All Scrum Teams have a common DoD that makes their combined Increment releasable

c)

Scrum Masters define their respective teams' DoD

d)

Each Scrum Team makes the differences in DoD transparent

5.

Which of the following is an example of an Increment?

a)

A plan for the overall product release

b)

A design for the product

c)

A product roll-out plan

d)

A valuable, useful set of product feature

6.

How are security NFRs catered to in Scrum? (Choose 2)

a)

Add security needs to the DoD

b)

Add a Sprint specifically for NFRs

c)

Delegate security NFRs to InfoSec Team

d)

Add security needs to the Product Backlog

7.

What enhances transparency of an Increment?

a)

Reporting sprint progress regularly

b)

Doing all work necessary to meet the DoD

c)

Updating Sprint task board regularly

d)

Keeping track of incomplete work in Sprint

8.

How much work must Developers do to a Product Backlog item that is selected into a Sprint? (Select 2)

a)

As much as told by management and PO

b)

As much as it confirms to DoD

c)

As much as it can be within a Sprint

d)

As much as it is in a usable and useful state