wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Lean for Everyone - DOWNTIME (Post Test)

Total questions: 10

Worksheet time: 6mins

Name
Class
Date
1.

The main objective of Lean is to

a)

Reduce/Eliminate waste from the process to maximize value and meet customer's expectation

b)

Reduce/Eliminate hazards at workplace

c)

Automate production and replace manpower resources

d)

Find sample for defects to pinpoint faults

2.

Which of the following is NOT the key concept of 7 Wastes of Lean in Lean management?

a)

Identifying the 8 types of waste will help you optimize resources and increase profitability.

b)

To improve employee's discipline by standardize work practices

c)

It will enable you to see if an activity is a necessary or pure waste.

d)

It will also help you realize the exact parts of the work process where you can improve.

3.

What is the new acronym for 8 Wastes of Lean in TechnipFMC?

a)

P.A.R.T.T.I.M.E

b)

R.E.S.T.T.I.M.E

c)

D.O.W.N.T.I.M.E

d)

F.U.L.L.T.I.M.E

4.

_______ are the 8th Wastes of Lean later introduced in the 1990s?

a)

Non-digitalized task

b)

Non-ergonomic motion

c)

Utilised talent

d)

Non-utilised Talent

5.

This type of waste is referring to 'moving parts and materials from one place to another'

a)

Motion

b)

Transportation

c)

Waiting

d)

Defects

6.

What is the TWO (2) ways to minimize /eliminate inventory waste?

a)

To have proper planning to keep raw material and finished goods inventories as lean as possible

b)

Clarify customers' standards and expectations ahead of time

c)

Remove excessive or unnecessary machine movements/actions

d)

Use Just-In-Time (JIT) inventory techniques

7.

Overproduction occurs doing more work, adding more components, or having more steps in a product or service than what is required by the customer.

a)

TRUE

b)

FALSE

8.

Puan A decides to put cutting sheet for pipe length 40m extra from the initial target due to "Just in case" scenario. She expected that the extra length can be combine with other pipe that has similar specification. However, the pipe was stored outside and was not well protected causing it to be corroded.


Select all the correct types of waste for situation above.

a)

Waiting

b)

Over Production

c)

Defect

d)

Motion

9.

Mr V is a QC inspector who responsible to test the bending sample. He will bring the sample from the shopfloor to the lab which is 500m away and need to wait for the sample to cool down before start the test. He will repeat this activity until the test result is passed.


Select all the correct types of waste for situation above.

a)

Non-Utilised Talent

b)

Waiting

c)

Motion

d)

Transportation

10.

Every month, Encik K has to place order scotch tapes to replenish his stock. On average, the demand for scotch tape is 50 units, however he decides to purchase extra 200 units from supplier as a buffer.


Select the correct type of waste for situation above.

a)

Inventory

b)

Over Production

c)

Extra processing

d)

Defects