wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Interpreting Plans and Specifications

Total questions: 36

Worksheet time: 18mins

Name
Class
Date
1.

T.B.M on a plan stands for

a)

Temporary bench mark

b)

The bottom mark

c)

The best mark

d)

All the above

2.

On a plan R.L relates to

a)

Right level

b)

Reduced Level

c)

Red Level

d)

Real level

3.

The title on a plan relates to

a)

The related falls on the plan

b)

The heights on a plan

c)

The owner and/or the description of the plan or project

d)

North facing

4.

On a plan the scale represents

a)

1.100

b)

The length of the project

c)

An object that has been reduced or enlarged on a plan

d)

The length of the project

5.

What is the best method to ensure that your string line set out is square

a)

Step it out, and set up your strings

b)

Hit in a and mark out your measurements on the ground

c)

Set up hurdles & use a 3,4,5 set out method

d)

set up a laser using a 4,5,9 method

6.

What is this on a plan

a)

A John Legend

b)

A Scale

c)

A Legend

d)

A Title

7.

Who won the Brownlow medal in (2018)

a)

Dustin Martin

b)

Tom Mitchell

c)

Patrick Dangerfield

d)

Nathan Fyfe

8.

A contour line is

a)

A line on a map or plan drawn through points of equal height

b)

A continues height

c)

A straight line

d)

All the above

9.

How do you measure a square meter

a)

L X W

b)

With a set square

c)

L X W X H

d)

All the above

10.

How do you measure a cubic meter

a)

W X H X L

b)

L X W X D

c)

LXW

d)

None of these

11.

When using a scale 1:100 on a plan how many cm represents 1m on site

a)

1cm

b)

10cm

c)

5cm

d)

2cm

12.

When using a scale 1:50 how many cm on the plan is equal to 1m

a)

10cm

b)

2cm

c)

5cm

d)

20cm

13.

how many wins does super horse Winx have in a row

a)

28

b)

27

c)

35

d)

29

14.

What colour is a green $2 Note

a)

Blue

b)

Dark red

c)

Green

d)

Orange

15.

Who is Stefani Germanotta

a)

Pink

b)

Beyonce

c)

Lady Ga Ga

d)

Katie Perri

16.

On a plan what does DP relate to

a)

Deep Pipe

b)

Down Pipe

c)

Drill Pipe

d)

Damp Proof

17.

On a plan what does MH stand for

a)

Max Height

b)

Meat Handle

c)

Man Hole

d)

All the above

18.

What does DPC stand for

a)

Dead pvc cap

b)

down pipe cover

c)

Damp proof course

d)

All the above

19.

What is the Australian Standard for electrical installations

a)

AS 3000

b)

AS 3700

c)

As 4720

d)

AS 2700

20.

What procedures should be taken before any excavation works commence

a)

Start digging,if you hit anything then call dial b4 you dig

b)

Obtain dial before you dig , and any other service plans

c)

Call the boss on another job site to see if its ok

d)

All the Above

21.

When receiving a plans there are always 2 types of drawings what are they

a)

Engineering plans and no specs

b)

Architects and and Engineers plans

c)

Architects plans and landscape plans

d)

Engineering plans

22.

Is it beneficial to have a set of specifications with drawings

a)

Yes

b)

No

c)

Maybe

d)

Who cares

23.

Can you use a tape measure to to scale up a plan

a)

no

b)

yes

c)

maybe

d)

all the above

24.

With variations what is the ideal scenario below

a)

verbally agree on it

b)

do it and worry about it later

c)

Have both builder and owner sign off on it

d)

All the above

25.

If there is conflict in drawings is it best to

a)

Ahhh She'll be right

b)

report it with the Archetect

c)

do nothing about it

d)

start the scope of works

26.

What is the name of Batman’s butler

a)

Alfred

b)

Geives

c)

Morgan

d)

Robin

27.

Where a project fits on a site is essential to implement correctly. What are 2 key methods to orientate a plan

a)

North point, and a Landmark (, building, road, etc.)

b)

south point

c)

the scale

d)

all the above

28.

How could we determine if we needed to refer to other plans to assist us with setting out a site

a)

Not enough information on the existing plan,

b)

different measurement to whats on the ground

c)

no engineers drawings

d)

all the above

29.

Whats the Australian Standard for Timber

a)

1684

b)

1687

c)

3740

d)

2870

30.

what year is the building act

a)

2006

b)

1993

c)

1995

d)

2002

31.

What year is the the Building Regs

a)

2019

b)

2018

c)

2017

d)

2000

32.

what book would you find deemed to satisfy

a)

Building Regs

b)

Building Act

c)

AS 3000

d)

NCC

33.

What order of Admin would you take before setting out site

a)

Dig first , Dial before you dig, ask the boss

b)

service plans, dig , service locator, dial before you dig

c)

Insurance, Dial before you Dig,service plans , service locator, then dig

d)

All of the Above

34.

What does GPO stand for?

a)

General post office

b)

General purpose outlet

c)

A night club

d)

All the above

35.

What does HWS stand for?

a)

Height, width, stance

b)

a football team in Sydney

c)

Hot water service

d)

all the above

36.

what does FC stand for

a)

Fiber cement

b)

football club

c)

fancy car

d)

all the above