1.

……………………….. is based on iterative incremental delivery as a response to changing and emergent requirements.

a)

Agile development model

b)

Evolutionary development model

c)

Rapid application development model

d)

Open source development model

2.

………………….. tends to be susceptible to performance problems that are not recognized until field tests, when they are finally .

a)

Evolutionary development

b)

Rapid linear sequence development

c)

Aspect-oriented development

d)

Workflow system development

3.

Not required for effective software project management?

a)

people

b)

process

c)

product

d)

popularity

4.

Following method is independent of technology, methodology and platforms

a)

Function Point

b)

Loc

c)

Both a and b

d)

none of the above

5.
a)

1,2,3,4,5,6

b)

4,2,5,1,3,6

c)

4,2,1,5,3,6

d)

4,2,1,3,5,6

6.

In FP, adjustment factor is measured in the range of?

a)

16-20

b)

0-5

c)

6-10

d)

11-15

7.

In Transition SE, tools are:

a)

encapsulation based

b)

custom

c)

repeatable

d)

off the shelf, separate

8.

change management environment

a)

central element

b)

technology element

c)

control element

d)

automation element

9.

....................is one

of the underpinnings of successful

software project management.

a)

construction

b)

elaboration

c)

inception

d)

lifecycle balance

10.

most critical phase?

a)

Research and development

b)

construction

c)

elaboration

d)

inception

11.

top level wOrkflows?

a)

MAAPER

b)

MRDIARE

12.

Following are the phases of Project Management Life Cycle. Arrange them in correct order

  1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery
a)

3142

b)

3214

c)

1432

13.

Controlling the changes in the project may affect

a)

The progress of the project

b)

project scope

c)

cost

d)

all of above

14.

Which includes modifications and updations done in order to correct or fix the problems, that are either discovered by user or concluded by user error reports?

a)

Perfective maintenance

b)

Adaptive maintenance

c)

Corrective maintenance

d)

Preventive maintenance

15.

Which phase is refers to the support phase of software development?

a)

coding

b)

testing

c)

maintenance

d)

implementation

16.

Four types of change are encountered during the support phase.Which one of the following is not one that falls into such category?

a)

correction

b)

prevention

c)

adaptation

d)

translation

17.

The model serves as the basis for the creation of ______ for the Software.

a)

design

b)

maintenance

c)

testing

d)

specification

18.

Throughout evaluation and solution synthesis, the analyst's primary focus is on ______

a)

“Not what, not "how"

b)

"What, also "how"

c)

"What, not "how"

d)

none of the above

19.

To avoid frustration during software development process

a)

give team members more control over process and technical decisions

b)

give team members less control over process and technical decisions

c)

hide bad news from team members

d)

rewards programmers based on their productivity

20.

Function point doesn't measure?

a)

input

b)

output

c)

enquiries

d)

markets