wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

DxI600/800

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

Which of the following cannot be added/changed during a run on DxI?

a)

Reaction Vessels (RVs)

b)

Substrate

c)

Wash Buffer

d)

All can be changed

2.

How long must the substrate be at room temperature before loading on the system?

a)

at least 6 hours

b)

at least 12 hours

c)

at least 8 hours

d)

at least 18 hours

3.

It is good practice to open the substrate load door to determine if there is adequate substrate on board.

a)

True

b)

False

4.

System Check will evaluate whether there is adequate particle mixing in the reagent pack.

a)

True

b)

False

5.

When loading substrate on the DxI, you must initiate a prime through the Diagnostics screen.

a)

True

b)

False

6.

The duckbill must be replaced every _________ tests.

a)

500

b)

1000

c)

5000

d)

10000

7.

DxI detection technology?

a)

Radioimmunoassay

b)

ELISA

c)

Chemiluminescence

d)

ElectroChemiluminescence

8.

The aspirate probes must be changed and cleaned every _______ tests.

a)

500

b)

1000

c)

5000

d)

10000

9.

What solutions do you need to perform Daily Clean in DxI 600/800 analyzer? (Could be more than one answer)

a)

Cleaning solution

b)

Contrad 70

c)

2% Wash Solution

d)

1:5 Citranox

10.

System check is used for:

a)

Calibrating

b)

Operating

c)

Training

d)

Troubleshooting

11.

Which of the following is chemiluminescent substrate used on DxI Immunoassay system?

a)

Acridinium ester

b)

Dioxetane

c)

Ruthenium Tris

d)

Invitrogen's CSPD

12.

If the laboratory is running HIV antibody levels, what is the special weekly maintenance needed?

a)

System check

b)

Replace new duck bill

c)

Installl new aspirate probe

d)

None of the above

13.

What is the throughput of DxI 800?

a)

200 tests/hour

b)

240 tests/hour

c)

320 tests/hour

d)

400 tests/hour

14.

How long will the Sample Storage Unit hold a sample vessel (SV) before it is discarded? (e.g due to no supply)

a)

3 hours

b)

5 hours

c)

8 hours

d)

24 hours

15.

Running System Check is a part of 10,000 test maintenance.

a)

True

b)

False

16.

How many storage slots/nests are in the Reagent Storage unit?

a)

48

b)

25

c)

50

d)

24

17.

How many (maximum) reagent pack/s can be load simultaneously on the reagent load tray in DxI800?

a)

1

b)

2

c)

3

d)

4

18.

What is X ?

a)

Wash Buffer Supply Drawer

b)

Solid Waste Door

c)

Liquid Waste Drawer

d)

Vessel Hopper Door

19.

What is X ?

a)

Wash Buffer Supply Drawer

b)

Solid Waste Door

c)

Liquid Waste Drawer

d)

Vessel Hopper Door

20.

What is the onboard stability for substrate?

a)

7 days

b)

14 days

c)

28 days

d)

30 days

21.

These condition require for re-calibrate except?

a)

Change Wash Buffer

b)

Change Calibrator

c)

The QC is outside SD limit

d)

Change reagent with new lot No.

22.

Which of the following are the factors that affect a Quality Control result? (more than one answer)

a)

QC preparation

b)

Calibration

c)

Solid waste bin

d)

Reagent

23.

What are the menu under sample manager? (more than one answer)

a)

In Progress

b)

Requested

c)

Daily

d)

Exceptions

24.

What is the default test availability (test left) for the new loaded substrate?

a)

200 tests

b)

400 tests

c)

600 tests

d)

800 tests

25.

It is compulsary to calibrate all test after performing interval maintenance to verify system performance.

a)

TRUE

b)

FALSE

26.

Which is the right flowchart to add new lot calibrator?

a)

Click "Calibration" - Click "Calibration Setup" - Click "Add Calibrator" - Scan the calibrator bar code information - Check the calibrator information and then Click "OK"

b)

Click "Calibration" - Click "Calibration Setup" - Scan the calibrator bar code information - Click "Add Calibrator" - Check the calibrator information and then Click "OK"

c)

Click "Calibration Setup" - Click "Calibration" - Scan the calibrator bar code information - Click "Add Calibrator" - Check the calibrator information and then Click "OK"

d)

Click "Calibration Setup" - Click "Calibration" - Click "Add Calibrator" - Scan the calibrator bar code information - Check the calibrator information and then Click "OK"

27.

Those are part of Daily Maintenance for DxI. (multiple answer)

a)

Back up the system

b)

Record the test count

c)

Shake down the solid waste container

d)

Run a clean routine

28.

How to prepare 1:501 System Check dilution?

a)

20 uL System Check + 100 mL Wash Buffer

b)

20 uL System Check + 10 mL Wash Buffer

c)

10 uL System Check + 20 mL Wash Buffer

d)

200 uL System Check + 10 mL Wash Buffer

29.

If you are shutting down the instrument and the PC, which

should be shut down first?

a)

Instrument

b)

PC

30.

What are the three System Command buttons?

a)

Stop

b)

Pause

c)

Resume

d)

Play