wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

TRAVERSE SURVEY

Total questions: 10

Worksheet time: 4mins

Name
Class
Date
1.

The operation in which the plumb line of a theodolite passes through the ground station mark is called

a)

Setting up

b)

Leveling

c)

Centering

d)

Transiting

2.

The departure of a line is obtained by

a)

LcosθL\cos\theta

b)

L cos2 θL\ \cos^2\ \theta

c)

L tan θL\ \tan\ \theta

d)

L sinθL\ \sin\theta

3.

The linear misclosure is generally expressed as a fraction of

a)

perimeter of traverse / closing error

b)

perimeter of traverse / bearing

c)

distance / perimeter of traverse

d)

angle / perimeter of traverse

4.

For a closed traverse, which check is more important and essential? Choose two answers.

a)

Σ Latitude = 0\Sigma\ Latitude\ =\ 0

b)

Σ Departure = 0\Sigma\ Departure\ =\ 0

c)

 Σ coordinates = 0\Sigma\ coordinates\ =\ 0  

d)

F.B - B.B = 180

5.

If n is the number of sides of a traverse, while traversing clockwise the sum included angles should be

a)

(2n +4) 90°\left(2n\ +4\right)\ 90\degree

b)

360°360\degree

c)

(2n 4) 90°\left(2n\ -\ 4\right)\ 90\degree

d)

(n 4)90°\left(n\ -\ 4\right)90\degree

6.

In traversing, the traverse can be

a)

Closed

b)

Open

c)

Closed with central station

d)

Closed or open

7.

Latitude of a line is defined as

a)

Orthographic projection of a survey line on the E-W line

b)

Orthographic projection of a survey line on the reference meridian

c)

None of the above

8.

Bearing of line A to B is  127°127\degree  and apart by 304.50 meter and . The Latitude of line AB is

a)

71.934

b)

-0.602

c)

243.185

d)

-183.253

9.

A traverse survey work can be classify as 2nd class order when its linear misclosure is 1:6780

a)

TRUE

b)

FALSE

10.

 tan1 error latitudeerror departure\tan^{-1}\ \frac{error\ latitude}{error\ departure}  is the formula to determine angular misclosure

a)

TRUE

b)

FALSE