Unit 104 Revision

Total questions: 21

Worksheet time: 12mins

Name
Class
Date
1.

What type of drawing is this?

a)

Schematic

b)

Site plan

c)

Scale drawing

d)

sketch

e)

Layout

2.

What is this?

a)

Work Layout

b)

Work Schedule

c)

Site plan

d)

Job Scale

e)

work spreadsheet

3.

What is this called?

a)

Scale drawing

b)

Schematic plan

c)

site plan

d)

layout instructions

e)

room layout

4.

What is this called?

a)

Scale drawing

b)

Schematic plan

c)

site plan

d)

layout instructions

e)

room layout

5.

What is this called?

a)

Manufacturer's instructions

b)

Information layout

c)

Machine schematics

d)

system instructions

e)

instruction schedule

6.

What type of floor does this diagram show?

a)

Screeded concrete floor

b)

Laminate floor

c)

tiled floor

d)

False floor

e)

Floating floor

7.

What type of floor does this diagram show?

a)

Screeded concrete floor

b)

Wooden sheet floor

c)

tiled floor

d)

False floor

e)

Floating floor

8.

What is the correct order of tasks for electricians?

a)

First fix, second fix, test and commission.

b)

First fix, test and commission, second fix.

c)

Test and commission, first fix, second fix.

d)

Second fix, first fix, test and commission.

9.

select 3 ways of maintaining good working relationships onsite.

a)

Good communication.

b)

Resolve disputes.

c)

Site meetings.

d)

Correct use of PPE.

e)

Sign written vans.

10.

Select which regulation covers notching & drilling of joists?

a)

Building Regulations Part A

b)

Building Regulations Part B

c)

Building Regulations Part C

d)

Building Regulations Part D

11.

Select 2 hazards you may face while lifting flooring in an occupied house?

a)

Falling through open gaps

b)

Pipes and cables concealed under the floor.

c)

Wild animals

d)

Losing screwdrivers

e)

Damaging work trousers.

12.

Select 2 hazards you may face while lifting flooring in an occupied house?

a)

Nails penetrating through the boards

b)

Blocking access routes

c)

Late starts onsite

d)

Blunt hammers

e)

Damaging your reputation.

13.

which source of information does the following describe?


'The sequence of work from start onsite to the completion of the contract.'

a)

Work Schedule

b)

Site Plan

c)

Scale Drawing

d)

Schematic

e)

Manufacturer's Instructions

14.

which source of information does the following describe?


'Shows the location of the site'

a)

Work Schedule

b)

Site Plan

c)

Scale Drawing

d)

Schematic

e)

Manufacturer's Instructions

15.

which source of information does the following describe?


'It shows the size of rooms, position of equipment, accessories and appliances.'

a)

Work Schedule

b)

Site Plan

c)

Scale Drawing

d)

Schematic

e)

Manufacturer's Instructions

16.

which source of information does the following describe?


'it shows how a system works.'

a)

Work Schedule

b)

Site Plan

c)

Scale Drawing

d)

Schematic

e)

Manufacturer's Instructions

17.

which source of information does the following describe?


'it describes how to assemble or install appliances and equipment'

a)

Work Schedule

b)

Site Plan

c)

Scale Drawing

d)

Schematic

e)

Manufacturer's Instructions

18.

what is the correct order for the stages of building construction?

a)

1.Setting out structure position

2.Laying building foundations.

3.Brick walls to roof line.

4.Installing roof structure.

5.1st Fixing pipes and cables

6.Dry lining/plastering internal walls.

7.Fitting kitchen units

8.Testing and commissioning systems

b)

1.Laying building foundations.

2.Setting out structure position

3.Brick walls to roof line.

4.Installing roof structure.

5.Fitting kitchen units

6.Dry lining/plastering internal walls.

7.1st Fixing pipes and cables

8.Testing and commissioning systems

c)

1.Setting out structure position

2.Laying building foundations.

3.Installing roof structure.

4.Brick walls to roof line.

5.Fitting kitchen units

6.Dry lining/plastering internal walls.

7.1st Fixing pipes and cables

8.Testing and commissioning systems

d)

1.Testing and commissioning systems

2.Laying building foundations.

3.Setting out structure position

4.Brick walls to roof line.

5.1st Fixing pipes and cables

6.Dry lining/plastering internal walls.

7.Fitting kitchen units

8.Installing roof structure.

19.

Identify the correct order to lift a floor board

a)

Roll back carpets

Check for pipes and cables

Cut down tongue and groove joint

Cross cut the board

Lift the board to expose the joists

De-nail the boards and joists

Barrier off the area to protect the customer

b)

Roll back carpets

Cut down tongue and groove joint

Cross cut the board

Check for pipes and cables

Lift the board to expose the joists

Barrier off the area to protect the customer

De-nail the boards and joists

c)

Check for pipes and cables

Cut down tongue and groove joint

Cross cut the board

Roll back carpets

De-nail the boards and joists

Lift the board to expose the joists

Barrier off the area to protect the customer

d)

Roll back carpets

De-nail the boards and joists

Check for pipes and cables

Cross cut the board

Cut down tongue and groove joint

Lift the board to expose the joists

Barrier off the area to protect the customer

20.

What does DPM stand for?

a)

Damp Proof Membrane

b)

Damp Patch Monitor

c)

Dry Proof Model

d)

Dry Post Mix

21.

Please identify 3 ways you can protect a customers property

a)

Use dust sheets

b)

Smash it all up with a hammer

c)

Ask them to move any valuable objects

d)

Refuse to do the job

e)

Record any existing damage