Chapter 2: Gathering Network Requirement

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.
a)
b)
c)
d)
2.
a)
b)
c)
d)
3.

A company is currently in implementation phase of the PPDIOO cycle. They have a question about the new equipment being installed in the wiring closet. Which two people should they contact for assistance? (CHOOSE TWO)

a)

account manager

b)

pre-sale systems engineer

c)

network designer

d)

post-sale field engineer

4.

What are TWO disadvantages to using top-down approach to network design? (CHOOSE TWO)

a)

This approach can result in an inappropriate network design

b)

A new design can not be implemented right away

c)

This approach contains very little organization requirements

d)

This approach is not as familiar to many network designers

5.

During an interview with the IT manager, it was discussed that the organization has two critical communication link to its main supplier. These links require an uptime 24/7. Which part of the PPDIOO process is most affected by this information?

a)

design phase

b)

implementation phase

c)

routing protocol selection

d)

prototype design plan

6.

A network consulting company is preparing a network requirements document for new client. The network design team is in the process of detailing the both the physical and logical infrastructure, as well as the equipment and applications in use on the network. Which part of the network design requirements document is the design team preparing?

a)

Overall goal

b)

Project Scope

c)

Network requirements

d)

Current state of the network

7.

A new technician has been hired in the company IT department. The IT manager gives the new technician the most current logical and physical network diagrams to review. Which TWO pieces of information should the technician be able to learn from diagram? (CHOOSE TWO)

a)

credentials for configuring devices

b)

contact information for installation technicians

c)

location of networking equipment

d)

standard naming conventions

8.

A network technician is assigned the task of updating the existing documentation for a single branch network that consists of all Cisco devices. The technician runs the Cisco Network Assistance at the workstation and issues the commands show cdp neighbors detail and show ip route on each device. Which TWO pieces informationcan be determined by using these tools? (CHOOSE TWO)

a)

device types and software versions of connected equipment

b)

workstation IP addresses

c)

network hierarchy

d)

total number of devices and hosts on the network

9.

Refer the diagram. What pieces of information can be obtained from the output of the show cdp neighbors detail command?

a)

The device is a 2600 series router

b)

The neighboring device is a switch

c)

The neighboring device is using interface serial 1/0 to connect to this device

d)

The hostname of this device is ROUTERZ

10.

A technician is dispatched to perform a wireless site survey at a stadium. What THREE tools or items does the technician need to take along? (CHOOSE THREE)

a)

laptop

b)

floor plan and tape measure

c)

Ethernet switch

d)

access point

e)

PC with terminal emulation software