1.

Define Demolition

a)

Process of taking off any existing structures and non-structures

b)

Process of taking off any existing structures only

c)

Process of taking off building material

d)

Process of removing all tress and green

2.

Types of demolition

a)

bridge

b)

Structures

c)

non-structures

d)

brickwork

3.

All are the reasons why demolition is conducted, except

a)

To construct a new building

b)

The existing building is not sufficient to accommodate current occupants

c)

Old and damage building

d)

The existing building is being ordered from the consultant to conduct a demolition works

4.

Which type of demolition is suitable for the above picture?

a)

General & site clearance

b)

Building

c)

Structure

d)

Scrap material

5.

Which types of demolition is suitable for the above picture?

a)

General and site clearance

b)

Building

c)

Structure

d)

Scrap material

6.

All of the below is the example of structure demolition, except?

a)

Bridge

b)

Tunnel

c)

Railway

d)

School

7.

This type of demolition usually being found as unused construction material on the site for example reinforcement bar, steel pipe & brc etc. This demolition material fall under which category?

a)

General & site clearance

b)

Building

c)

Structure

d)

Scrap material

8.

Types of demolition

a)

Control demolition

b)

Complete demolition

c)

Soft Demolition

d)

Renovation

9.

Surveying work before demolition works involved

a)

The condition of the existing building i.e building material, location etc.

b)

The sensitivity of the neighborhood area

c)

Adjoining padestrial and vehicular traffic condition

d)

Selection of method of demolition

10.

Asbestos containing material

a)

Air conditioner duct installation

b)

Gasket

c)

Glove

d)

Fire door

11.

Conventional method of demolition

a)

Hammer

b)

Ball and Crane

c)

High reach method

d)

Hybrid method

12.

This method of demolition is using a________________

a)

Hammer

b)

Ball & crane

c)

High reach method

d)

Hybrid method

13.

the most suitable method to conduct demolition for 16 storey building at the centre of Kuala Lumpur is

a)

Explosive method

b)

High reach method

c)

Hybrid method

d)

Ball and crane

14.

Suitable demolition method for 3m length ground floor beam

a)

Hammer

b)

Ball and crane

c)

Pneumatic breaker

d)

hydraulic breaker

15.

Types of demolition works which used diamond cutter and high reach machine

a)

Hammer

b)

Ball and crane

c)

High reach method

d)

Hybrid method

16.

Define renovation works

a)

Taking out all part of the building structures

b)

Taking out a part of building structures and doing a repairing works

c)

Improving broken, damages or outdated structures

d)

Interior designing works

17.

Steps of Renovation

a)

Plan, Hire, Budget, Permit, Starts

b)

Plan, Budget, Hire, Permit, Starts

c)

Plan, Budget, Permit, Hire, Starts

d)

Budget, Plan, Permit, Hire, Starts

18.

Reason of Renovation

a)

Improving building value

b)

Fixing safety issue

c)

Make building up to date

d)

To increase comfort

19.

Renovation works involve searching for a suitable contractor to carry out the works. This works falls under

a)

Plan

b)

Budget

c)

Hire

d)

Permits

20.

Renovation works required approval from a local authority foe example Majlis perbandaran, bomba etc. This fall under step of

a)

Plan

b)

Budget

c)

Hire

d)

Permits