WorksheetsTPVI Opscom
Total questions: 15
Worksheet time: 3mins
The _ identifies the existing hazards and conditions and determines the required work site precautions.
Maintenance Supervisor
Permit Receiver
Permit Issuer
Isolation Officer
A _ is a method to refresh workers’ knowledge, cover last minute safety checks, and exchange information with the experienced workers.
SHE Induction
Toolbox Meeting
SHE Committee Meeting
Onboarding
This symbol represents...
Management of Change
Energy Isolation
Bypass Safety Controls
Permit to Work
It is a wearable, handheld device that detects the presence of gases in an area, often as part of a safety system.
Multimeter
Gas detector
Anemometer
Thermal Scanner
Critical Lift is one with the hoisted load approaching _ of the crane's maximum capacity.
100%
90%
80%
75%
Permit to Work may be extended only _ with a maximum of _.
once, 14 days
twice, 14 days
once, 28 days
twice, 28 days
This symbol represents...
Permit to Work
Energy Isolation
Bypass Safety Controls
Engineering Management of Change
In a hot work activity, no flammable materials should be within a minimum of _ from the area of work:
3 meters
5 meters
7 meters
10 meters
If there is a need for more than 1 Permit Receiver, the handover of duties should be formalized by (2 answers)
Toolbox Meeting
Daily Work Party Statement of Understanding
Shift Turnover Sheet
PTW Transfer Authority
This symbol represents:
Energy Isolation
Engineering Management of Change
Bypass Safety Controls
Mechanical Lifting
Work cancellation occurs when
new potential threat has been identified
there is a minor incident
there is a major change of work scope
The ideal application of permit to work is on a _ ratio.
2:1
1:2
1:1
This symbol represents..
Mechanical Lifting
Permit to Work
Management of Change
Hot Work
Scafftags are valid for _ from date of inspection, regardless of results.
1 day
7 days
10 days
14 days
He / She ensures that a toolbox meeting is conducted before the start of every work.
Isolation Officer
Permit Issuer
Permit Receiver