Worksheetscivil engg quiz 2
Total questions: 25
Worksheet time: 8mins
Soundness test of cement is carried out to determine
free lime content
Alumina content
Iron oxide content
Sulphur content
What process is adopted for making timber fire resistant
ASCU treatment
Abel's Process
Tarring
Creosoting
If w is the percentage of water required for normal consistency ,then amount of water to be added for initial setting time is
0.5w
0.62w
0.75w
0.85w
Kind of survey work in which curvature of earth is ignored is called
Aerial survey
Geological survey
Geodetic survey
Plane survey
As per IS specification the length of one link in 30m chain is
20cm
30cm
10cm
40cm
instrument used for measurement of angles
Geodimeter
Tellurimeter
Sextant
Telescope
The magnetic bearing of a line is 62°20' and the magnetic declination at that place is 2°50'E, then true bearing of the line is
64°70'
60°30'
59°30'
65°10'
Mean Sea level considered for India is
Mumbai port
Kolkata port
Karachi port
Vishakapattanam port
Hydrophobic cement is obtained by grinding portland cement clinker with
Hydrocloric acid
Calcium Chloride
Calcium carbonate
Oleic acid
Common sugar added to concrete to
increase the strength of concrete
Retard setting time of concrete
Accelerate setting time of concrete
increase the workability
Air permeability test is done to measure
Setting time of cement
Chemical composition
Soundness
Fineness
For concrete exposed to dry condition minimum curing period should not less than
7 days
5 days
10 days
14 days
A line normal to Plumb line at all points
vertical line
Horizontal line
Datum line
Level line
The Forebearing and Backbearing of a line differ exactly by
90°
180°
45°
135°
Among the following which equipment is not used in chain survey
Ranging rod
Alidade
Offset rod
Plumb bob
Which of the following is not included in temporary adjustment of dumpy level
setting up
Levelling up
Ellimination of Parallax
Centering
which among the following is the back bearing of N30°E is
E30°N
N150°E
S150°W
S30°W
Least count of transit theodolite is
20'
30'
20"
30"
Nominal size of standard brick
19cmx9cmx9cm
20cmx10cmx10cm
22cmx11.5cmx7.5cm
20cmx10cmx5cm
Ingredient which imparts quick setting property is
Silica
magnesia
Calcium Sulphate
Alumina
Vertical joints separating brick in either length or cross direction is
Toothing
Perpends
Arrises
Raking back
Name the type of formwork which are raised while concrete is in plastic state is
steel form
Timber form
Trestle form
Slipforms
In order to setting a perpendicular offset to a chain line ,instrument used is
Clinometer
Planimeter
Pentagraph
Optical Square
The inclination of needle with horizontal position is
Declination
Dip
Deflection
Local attraction
The relative error of closure in theodolite traversing is ratio of
sum of departure to sum of lattitudes
sum of lattitudes to sum of departures
Error of closure to total perimeter
Error of closure to total lattitude