wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

civil engg quiz 2

Total questions: 25

Worksheet time: 8mins

Name
Class
Date
1.

Soundness test of cement is carried out to determine

a)

free lime content

b)

Alumina content

c)

Iron oxide content

d)

Sulphur content

2.

What process is adopted for making timber fire resistant

a)

ASCU treatment

b)

Abel's Process

c)

Tarring

d)

Creosoting

3.

If w is the percentage of water required for normal consistency ,then amount of water to be added for initial setting time is

a)

0.5w

b)

0.62w

c)

0.75w

d)

0.85w

4.

Kind of survey work in which curvature of earth is ignored is called

a)

Aerial survey

b)

Geological survey

c)

Geodetic survey

d)

Plane survey

5.

As per IS specification the length of one link in 30m chain is

a)

20cm

b)

30cm

c)

10cm

d)

40cm

6.

instrument used for measurement of angles

a)

Geodimeter

b)

Tellurimeter

c)

Sextant

d)

Telescope

7.

The magnetic bearing of a line is 62°20' and the magnetic declination at that place is 2°50'E, then true bearing of the line is

a)

64°70'

b)

60°30'

c)

59°30'

d)

65°10'

8.

Mean Sea level considered for India is

a)

Mumbai port

b)

Kolkata port

c)

Karachi port

d)

Vishakapattanam port

9.

Hydrophobic cement is obtained by grinding portland cement clinker with

a)

Hydrocloric acid

b)

Calcium Chloride

c)

Calcium carbonate

d)

Oleic acid

10.

Common sugar added to concrete to

a)

increase the strength of concrete

b)

Retard setting time of concrete

c)

Accelerate setting time of concrete

d)

increase the workability

11.

Air permeability test is done to measure

a)

Setting time of cement

b)

Chemical composition

c)

Soundness

d)

Fineness

12.

For concrete exposed to dry condition minimum curing period should not less than

a)

7 days

b)

5 days

c)

10 days

d)

14 days

13.

A line normal to Plumb line at all points

a)

vertical line

b)

Horizontal line

c)

Datum line

d)

Level line

14.

The Forebearing and Backbearing of a line differ exactly by

a)

90°

b)

180°

c)

45°

d)

135°

15.

Among the following which equipment is not used in chain survey

a)

Ranging rod

b)

Alidade

c)

Offset rod

d)

Plumb bob

16.

Which of the following is not included in temporary adjustment of dumpy level

a)

setting up

b)

Levelling up

c)

Ellimination of Parallax

d)

Centering

17.

which among the following is the back bearing of N30°E is

a)

E30°N

b)

N150°E

c)

S150°W

d)

S30°W

18.

Least count of transit theodolite is

a)

20'

b)

30'

c)

20"

d)

30"

19.

Nominal size of standard brick

a)

19cmx9cmx9cm

b)

20cmx10cmx10cm

c)

22cmx11.5cmx7.5cm

d)

20cmx10cmx5cm

20.

Ingredient which imparts quick setting property is

a)

Silica

b)

magnesia

c)

Calcium Sulphate

d)

Alumina

21.

Vertical joints separating brick in either length or cross direction is

a)

Toothing

b)

Perpends

c)

Arrises

d)

Raking back

22.

Name the type of formwork which are raised while concrete is in plastic state is

a)

steel form

b)

Timber form

c)

Trestle form

d)

Slipforms

23.

In order to setting a perpendicular offset to a chain line ,instrument used is

a)

Clinometer

b)

Planimeter

c)

Pentagraph

d)

Optical Square

24.

The inclination of needle with horizontal position is

a)

Declination

b)

Dip

c)

Deflection

d)

Local attraction

25.

The relative error of closure in theodolite traversing is ratio of

a)

sum of departure to sum of lattitudes

b)

sum of lattitudes to sum of departures

c)

Error of closure to total perimeter

d)

Error of closure to total lattitude