What is the objective of site supervision works?
To ensure contractor comply with authority requirement
To ensure contractor comply with the specification
To ensure contractor comply with estate regulation
To ensure contractor comply with workers need
What is the equipment use for verticality inspection?
Ruler
Measurement tape
Spirit level
Caliper
Which of the following is not a construction procurement method?
Turnkey
Management delivery
Internally managed
Separate & co-operative
Which of the following is not a tool to ensure on-time project completion?
Quality assurance procedure
Gantt chart works program
Physical progress 'S' curve
Weekly and monthly reports
Which of the following is not a cause of variation orders?
Additional earthworks
Additional manpower and machinery required
Additional substructure works (piling)
Change of specification
Which of the answer is not type of bridge?
Composite Bridge
Steel Bridge
Reinforced Concrete Bridge
Span Bridge
What is ACWC for road?
Asphaltic Concrete Wearing Course
Asphaltic Curing Weather Course
Ash Curing Weather Course
Ash Concrete Wearing Course
For Sub Base laying it must be compacted layer by layer. What is the thickness of each layer?
350 mm
300 mm
250 mm
200 mm
Which of the following is not the main bridge component?
Piles
I Beam
Abutment
Loading signage
What is the structure which is horizontal and above to stump?
Column
Roof beam
Ground beam
Lintol