WorksheetsQUIZ SCM 300 WEEK 3
Total questions: 15
Worksheet time: 4mins
What are the objectives of the KANBAN procedure?
Shortening the lead times
Maximize the
manual posting
Maximize Stock
Shortening the workcenters
In the KANBAN procedure, replenishment is initiated when the demand source sets the container in the system to "empty"
True
False
Name the basic master data of KANBAN ?
Sales master data
Machine process
Material master data
Supply Area
Setting the KANBAN to EMPTY = Posting Good Receipt
True
False
Setting KANBAN to Full = Posting Goods Receipt
True
False
What is the focus of Kanban Procedure?
Planning Instrument
Push Principle
Demand Based
BOM Explotion
MRP creates massive planning segments for each production lot.
True
False
Production planning specifies the concrete quantities for production lots for the planning period (month, quarter).
True
False
Project-oriented production is used in those industries and industry sectors where anonymous make-to-stock production.
True
False
The valid BOM and routing for MRP or the production order are selected in a special selection procedure
True
False
Where is Ensyse Laboratory located?
C205
C207
C206
C208
So! What is the assistant code for assistant in the picture?
LAN
AGS
ADP
JNA
Who is the prettiest assistant in Ensyse Laboratory?
ADP
ARV
AGS
ARS
What generations of Ensyse Laboratory recruitment now?
ENSYSE 5.0
ENSYSE 3.0
ENSYSE 4.0
ENSYSE 3.5
Who is the most handsome in Ensyse Laboratory?
JED
OLE
FIF
VVT