Which of the following is not the type of Pile foundation by functioning :
End Bearing Piles
Bored Piling
Friction Piles
None
Which of the following is not the type of Pile foundation by installation :
Bored Piling
Friction Piles
Driven Piles
None
What is the other name of DRIVEN PILES :
REPLACEMENT PILES
BORED PILES
DISPLACEMENT PILES
None
Boring for a pile shall not be commenced until 24 hours after completion of any pile :
within a radius of 6 meters, center to center
within a radius of 1 meters, center to center
within a radius of 3 meters, center to center
None
During Pile Foundation, Bentonite powder must be added to the mixing water :
at one time
In the beginning & in the end of mixing
gradually
None
A tremie is a pipe that can be used :
for pouring water below ground level
for pouring concrete below ground level
for pouring anti termite below ground level
None
Flushing of bore is done while :-
putting concrete below ground level
inspection of excavation
pile boring
None
The test that can be used to estimate the unknown length of existing piles and foundations is called :
Pile Integrity Test (PIT)
low strain impact integrity testing of deep foundation
Pile Load test
Both Pile Integrity Test (PIT) & low strain impact integrity testing of deep foundation
Stack height not more than
20 bags
15 bags
10 bags
nONE
Which of the following is not the acceptance test of Bricks
Shape, Size & colour :
Fingernail mark
Drop from 1m height
clear ringing sound
None